Download Print this page

Mounting Instructions - Pentair Westlock 2300 Ex ia Series Installation & Operating Instructions Manual

Advertisement

Installation & Operating Instructions. 
Westlock 2300 Ex ia Position Monitor – ATEX / IECEx Certified. 
With Mechanical Switches, Inductive Proximity Sensors or Magnum Proximity Switches. 
 
4.0
Mounting Instructions. 
 
Required Tools: Only use spanners of the correct size or an adjustable spanner to fit hex head bolts in the mounting kit. 
 
4.1
Obtain a mounting kit suited for the actuator/valve, commonly available through a local Westlock Controls distributor. 
4.2
Attach the mounting bracket and coupler (if required) to the unit housing with the hardware provided. Typical actuator 
hardware is M5 (8mm A/F) and switchbox mounting M6 (10mm A/F) or M8 (13mm A/F). 
4.3
Attach the unit and mounting system to the actuator. See Figure 1. 
4.4
Ensure axial alignment between unit shaft, coupler and actuator shaft.  Failure to correctly align could result in 
long‐term stress‐related failure of unit shaft in high cycle or high torque applications. 
 
 
 
Before stroking the actuator to the fully closed position, please ensure that the process is safe to do so. 
 
 
 
 
 
 
 
 
 
 
 
280 N. MIDLAND AVE., STE 258, SADDLE BROOK, NJ 07663 TEL: 201-794-7650 FAX: 201-794-0913
1/20/2016
Fig 1 
PENTAIR VALVES & CONTROLS.
TECHUK-95 REV 1 ECN#12787-E
 
4 of 9

Advertisement

loading