Installation; Overhead Rigging - EuroLite LED Z-PAR QCL 7X10W User Manual

Table of Contents

Advertisement

Available languages

Available languages

MENU
DMX IN
DMX occupation:
DMX occupation:
1: Ground
1: Ground
2: Signal (–)
2: Signal (–)
3: Signal (+)
3: Signal (+)
7
8
9
10

INSTALLATION

The device can be installed on the ground or on the wall or ceiling.

Overhead rigging

Please consider the EN 60598-2-17and the respective national standards during the installation!
The installation must only be carried out by an authorized dealer!
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
UP
DOWN
ENTER
DMX OUT
FUSE
POWER
11
12
13
14
15
DANGER TO LIFE!
(7) Control Board
(8) LED display
(9) DMX input
(10) Menu button
(11) Up button
(12) DMX output
(13) Down button
(14) Enter button
(15) Power input
(16) Fuse holder
16
19/26
00091873, Version 1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

51916500

Table of Contents