Connect Ac Power Wires And Orp Sensor Wires - Pentair IntelliChlor COMSYS-14 Installation Manual

Electronic chlorine generator
Table of Contents

Advertisement

Mount Power Center Banks To Wall
4. Remove the cover retaining screw and remove the
cover from upper side left PRIMARY power center
and the lower left side SECONDARY power center.
Remove cover screw and cover from
Remove cover screw and cover from

Connect AC Power Wires and ORP Sensor Wires

1. Mount a JUNCTION BOX on the left side of the Power Center Banks.
2. Run a CONDUIT (with 208VAC - 260VAC
wires) from the AC BREAKER to the
junction box. Note: This AC power should be
on its own breaker for future servicing.
Note: For 110VAC operations, each power
center will need to be re-configured. A
110VAC wiring diagram is provided on the
inside of each the power center covers.
3. Run conduit from the junction box into each
of the power centers located on the left side
(PRIMARY and SECONDARY). A (knock-
out) conduit opening is provided on the
bottom of each of power centers.
(Continued)
PRIMARY POWER CENTER
SECONDARY POWER CENTER
Mount power center
bank to wall using six
IntelliChlor Electronic Chlorine Generator COMSYS-14 Installation Guide
Mount power
center bank to
wall using six (6)
screws
(6) screws
CPC203
Knock-out opening for
conduit
CPC104
CPC203
3
CPC104

Advertisement

Table of Contents
loading

This manual is also suitable for:

520976

Table of Contents