Download Print this page
Homelegance MF-850T Assembly Instruction

Homelegance MF-850T Assembly Instruction

Twin mattress foundation

Advertisement

Quick Links

PART LIST:
A: Rail Upper Section
2PCS
H: Slat
12PCS
HARDWARE LIST:
1: Bolt
1/4*35mm
X 20pcs
ASSEMBLY INSTRUCTION
MF-850T TWIN MATTRESS FOUNDATION
B: Rail Down Section
2PCS
I: Slat Connector
20PCS
2: Bolt
1/4*16mm
X 8pcs
D:Rail Support Bar
10PCS
K:Coverlet
1PC
3: Bolt
3/16*16mm
X 4pcs
E:Rail Connector Bar
2PCS
4: Ratchet Tool
X 1PC
Page:1/4

Advertisement

loading
Need help?

Need help?

Do you have a question about the MF-850T and is the answer not in the manual?

Questions and answers

Summary of Contents for Homelegance MF-850T

  • Page 1 ASSEMBLY INSTRUCTION MF-850T TWIN MATTRESS FOUNDATION PART LIST: B: Rail Down Section D:Rail Support Bar E:Rail Connector Bar A: Rail Upper Section 2PCS 10PCS 2PCS 2PCS I: Slat Connector H: Slat K:Coverlet 12PCS 20PCS HARDWARE LIST: 1: Bolt 2: Bolt...
  • Page 2 How to Use the Ratchet Tool (4) 1. Before assembling the furniture, please adjust the lock as needed. Lock on the left Lock on the right to tighten bolts! to loosen bolts! 2. Tighten or loosen bolts. Tighten bolts: Locate the turncap and rotate it clockwise to screw the bolt quickly until it cannot be rotated any more.
  • Page 3 N ote: Please do not tighten all bolts until the bed is assembled completely. STEP 1 STEP 2 Hardware 3: 4 pcs Hardware 1: 20 pcs STEP 3 STEP 4 Hardware 2: 8 pcs STEP 5 Hardware 4: 6 pcs Page:3/4...
  • Page 4 N ote: Please do not tighten all bolts until the bed is assembled completely. STEP 6 COMPLETED Page:4/4...