Refrigerant Piping Work
Precautions for Laying Refrigerant Piping
• Cautions on pipe handling
1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender for
bending.
• Selection of copper and heat insulation materials
When using commercial copper pipes and fittings, observe the following:
1) Insulation material: Polyethylene foam
Heat transfer rate: 0.041 to 0.052W/mK (0.035 to 0.045kcal/mh°C)
Refrigerant gas pipe's surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this temperature.
2) Be sure to insulate both the gas and liquid piping and to provide insulation dimen-
sions as below.
Gas pipe
O.D.9.5mm
Minimum bend radius
30mm or
more
Thickness 0.8mm (C1220T-O)
3) Use separate thermal insulation pipes for gas and liquid refrigerant pipes.
4) Piping and other pressure containing parts shall comply with the applicable legislation and shall be suitable for refrigerant.
Use phosphoric acid deoxidised seamless copper for refrigerant.
• Flaring the pipe end
1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing down-
ward so that the chips do not enter the pipe.
3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.
WARNING
• Do not use mineral oil on flared part.
• Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
• Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
• Never install a dryer to this R32 unit in order to guarantee its lifetime.
• The drying material may dissolve and damage the system.
• Incomplete flaring may cause refrigerant gas leakage.
10
Liquid pipe
O.D.12.7mm
O.D.6.4mm
40mm or
30mm or
more
more
Gas pipe
Liquid pipe
insulation
insulation
I.D.12-15mm
I.D.8-10mm
Thickness
Thickness
13mm min.
10mm min.
(Cut exactly at
right angles.)
Set exactly at the position shown below.
A
Flare tool for R32 or R410A
Clutch-type
Die
A
0-0.5mm
Be sure to
place a cap.
Rain
If no flare cap is
available, cover
the flare mouth
with tape to keep
dirt or water out.
Inter-unit wires
Gas pipe
Gas pipe
insulation
Finishing tape
Remove burrs
Flaring
Conventional flare tool
Clutch-type (Rigid-type)
1.0-1.5mm
Check
Flare's inner
surface must
be flaw-free.
Wall
Liquid pipe
Liquid pipe
insulation
Drain hose
Wing-nut type (Imperial-type)
1.5-2.0mm
The pipe end must
be evenly flared in
a perfect circle.
Make sure that the
flare nut is fitted.