  • Page 1 COMMERCIAL ENERGY STORAGE SOLUTIONS SME BATTERY CABINET INSTALLATION MANUAL 64 KWH...
  • Page 2 *The battery packs weigh 76kg. It is advised that these are not lifted manually and the use of a lifting device is recommended. Please speak to a GivEnergy representative if uncertain. For technical support call 01377 252 874 or email commercial@givenergy.co.uk...
  • Page 3 HANDLING INSTALLATION ENVIRONMENT Delivery and unpackaging Environment criteria The battery cabinet and battery packs are delivered on 2 separate pallets. To ensure optimal operation and lifetime of the system, it must be installed in an environment that meets the following criteria at a minimum: The battery cabinet will be delivered palletised in a cardboard box: 0°C to 40°C Remove all packaging and foam protection...
  • Page 4 Ensuring that both the MCCB and power button on the high voltage box are both OFF, the batteries can be Battery 2 installed in the order shown on the next page. Battery 1 HV Box Cable entry cover For technical support call 01377 252 874 or email commercial@givenergy.co.uk...
  • Page 5 All connections in and out of the battery cabinet/high voltage box must be made LAN or WiFi. prior to installing the battery packs. The GivEnergy engineer will help install and confi gure the LAN or WiFi connectivity and ensure DC output communication with the online portal.
  • Page 6 INITIAL TESTING / COMMISSIONING Power-on procedure All GivEnergy commercial storage solutions include an on-site commissioning service. Our engineer will ensure correct communication with meter, battery packs, EMS and PCS. To aid in this testing, the engineer Once all connections are terminated correctly with satisfactory test results, the following turn on will initially run a low power test in ‘manual’...
  • Page 7 Ensure that the ventilation holes on the front door of the battery cabinet do not become blocked with dust. Support Free remote support is included with all systems for the period of the warranty. Phone: 01377 252 874 Email: commercial@givenergy.co.uk...
  • Page 8 www.givenergy.co.uk...