Klarstein HIGH LINE 2.0 ECO Manual page 21

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17
Ceiling Installation
Saw a hole in the ceiling according to
the dimensions of the extractor hood.
Ceiling
Push the extractor hood upwards until the brackets engage in the false ceiling. If you
do not engage, use a screwdriver to pierce the four holes in the lower corners of the
hood.
Note: The ventilation pipe must be installed after adjusting the extractor hood.
Slide the extractor hood into the
opening.
Hood
The brackets should be adjusted so that
the lower edge of the extractor hood is
flush with the ceiling. Screw 4 screws
through the four holes in the lower
corners of the hood.
Brackets
EN
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

1004536010045361

Table of Contents