9.1.3 Error displays
• When error occurs, "Err" and "Number of errors occurred" are alternately displayed on
the 7-segment display every 1 second.
• For the content of error, please refer to the "10.2. Error codes".
• When error codes are displayed, all the error codes can be confirmed by pressing the
"SELECT" button.
Example:
When "Indoor unit capacity error [E221]" and "Indoor unit duplicate address error [E261]"
occurred.
(*1) When the address of the overlap indoor unit is
(*2) When errors other than the address of the
If error occurs, it will display "-".

9.2. Pre-check for test run

Before the test operation, check the following items.
(1) Is there a gas leakage? (At pipe connections {flange connections and brazed areas})
(2) Is the system charged with the specified volume of refrigerant?
(3) Is the refrigerant circuit address correct?
(4) Is a breaker installed at the power supply cable of outdoor unit?
(5) Are the cable connected to the terminals without looseness, and in accordance with
the specifications?
(6) Are the initial settings of the switches of the outdoor unit correctly configured?
(7) Is the 3-way valve of the outdoor unit open? (Gas pipe and liquid pipe)
(8) Is power supplied to the crank case heater for more than 12 hours? Electricity current
in short period of time may result in compressor damage.
(9) Are all the indoor units within the same coolant system connected to the power? Op-
erating indoor units which are not connected to the power may result in malfunctions.
(10) Is Indoor unit connection check performed? Test run doesn't operate if Indoor unit
connection check is not performed.
After checking that the above items are all in order, refer to
"9.3. Test run method" to test operation the unit.
If there are problems, adjust immediately and recheck.

9.3. Test run method

Be sure to configure test run settings only when the outdoor unit has stopped operating.
• Depending on the communication status between the indoor and outdoor units, it may
take several minutes for the system to start operating after settings for the test run are
complete.
• After the test run settings are complete, the outdoor unit and the connected indoor
units will start operating. Room temperature control will not activate during test opera-
tion (continuous operation).
• If a knocking sound can be heard in the liquid compression of the compressor, stop
the unit immediately and then energize the crank case heater for a sufficient length of
time before restarting the operation.
Perform test operation for each refrigerant system.
You can set "cooling test operation" or "heating test operation" with the push button on the
outdoor unit PC board.
En-17
displayed, press and hold the "ENTER" button
for more than 3 seconds.
overlap indoor unit exist, press "SELECT" but-
ton to switch to the next error.
[Ad + address number]
Test operation setting method
Use the "MODE/EXIT", "SELECT", and "ENTER" buttons on the indoor unit PC board to
configure settings according to the procedures below.
First 2 digits Last 2 digits
Set to Function mode [F3].
(When [F4] to [F9] are displayed, continue to press
the "SELECT" button until [F3] is displayed.)
For heating operation, press the "SELECT"
button until "01" is displayed.
Press the "ENTER" button for
more than 3 seconds.
This will be displayed
when the cooling test
operation is complete.
This will be displayed after 5 seconds.
Press the "ENTER" button for more than 3 seconds.
This will be displayed when the cooling operation mode is
canceled.
This will be displayed after 5 seconds.
EXIT
After the test operation is complete, turn off the power. Attach the cover of the electrical
component box and the front panel of the outdoor unit.
NOTES:
• Check that the indoor and outdoor units connected to the same refrigerant system are
operating normally.
• When indoor or outdoor units are not operating, or when the indoor and outdoor units
of other refrigerant systems are operating, the indoor/outdoor unit address are not
configured correctly.
• The system will not operate normally with an incorrect DIP switch setting.
Stop the system immediately and recheck the DIP switch setting.

9.4. Checklist

Check description
High and low pressure values
1
are normal.
Drain water is discharged
2
smoothly through the drain
hose.
Indoor and outdoor unit fans
3
are operating.
Compressor operates after
4
the indoor unit operates.
Difference between inlet and
5
outlet temperatures is normal.
6
Error is not displayed.
Function settings
Settings for starting test run
operation
Press the "ENTER" button for
more than 3 seconds.
This will be displayed
when the heating test
operation is complete.
Settings for stopping test run
operation
Check method
Criteria
Cooling: low pressure ap-
Check it with a pres-
prox. 0.8 MPa
sure gauge.
Heating: high pressure
approx. 3.0 MPa
Check it by pouring
water.
Check them visually.
Check the operating
sound.
Measure the inlet and
Temperature difference
outlet temperatures.
10 degrees
Check the 7-segment
Error blinking or no error
display.
code display