Samsung SCX-6322DN/XAZ Service Manual page 43

Digital laser mfp
Table of Contents

Advertisement

Alignment & Adjustments
T T est No
est No
Test Items (Description)
est Items (Description)
MHV SUPPL
MHV SUPPLY 1350V
1350V
MHV
MHV ADC READ
ADC READ
DEV SUPPLY 450V
DEV SUPPL
450V
[5] [5]
THV SUPPLY NEG VOL
THV SUPPL
NEG VOLT
THV SUPPLY 1301V
THV SUPPL
1301V
THV
THV ADC READ
ADC READ
[6] [6]
Auto
Auto TEST
TEST
Service Manual
4-16
[1] [1]
ON
Supply 1350V to the MHV
Read and display the MHV ADC (Analog-To-Digital Conversion)
CHECK
value.
ON
Supply 1450V to the DEV (Developer).
ON
Supply negative voltage to the THV
ON
Supply 1300V to the THV
CHECK Read and display the THV ADC value.
NEXT : RIGHT KEY
EXIT : STOP KEY
Automatic Test Sequence
Control Code
Control Code
[2] [2]
OFF
Disconnect voltage from MHV
NEXT
Go to the next test (go to DEV SUPPLY 450V)
OFF
Disconnect voltage from DEV
OFF
Disconnect negative voltage from THV
OFF
Disconnect voltage from THV
NEXT
Go to the next test (go to MHV SUPPLY 1350V)
Automatically start to test with 2 sec intervals.
Go to the top level of Engine test mode.
1
ALL MOTOR CONTROL
2
FUSER MOTOR CONTROL
3
DEV MOTOR CONTROL
4
DUPLEX CONTROL
5
FCF PICKUP CONTROL
6
M P PICKUP CONTROL
7
PTL CONTROL
8
FAN CONTROL
9
FUSER CONTROL
10
LSU MOTOR CONTROL
11
LASER DIODE CONTROL
12
SENSOR DETECT
13
MHV CONTROL
14
DEV CONTROL
15
THV NEG CONTROL
16
THV CONTROL
17
MHV ADC READ
18
THV ADC READ
19
TEST END
Samsung Electronics

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scx-6322dn/xeu

Table of Contents