65BDL3652T/75BDL3652T/86BDL3652T
2.
Unpacking and Installation
2.1.
Unpacking
•
This product is packed in a carton, together with the standard accessories.
•
Any other optional accessories will be packed separately.
•
As this product is high and heavy, the operation of moving the device is recommended to be performed by two technicians.
•
After opening the carton, ensure that the contents are complete and in good condition.
Before Unpacking
■
•
Please read and fully understand unpacking notice before installation.
•
Make sure no serious damages to the packaging.
•
Please do necessary inspection before taking out the display.
•
Installation should only be performed by professional technicians.
Notice
■
•
Take the display out of the carton box by two adults with both hands.
•
Hold the handles on the back of the display.
•
Please keep the display vertically when moving it.
10