Mitsubishi Electric PLK-J10050R Technical Manual page 6

Industrial sewing machine
Table of Contents

Advertisement

6-7. Adjustment of the thread take up spring····················································
6-7-1. Adjusting movable range of the thread take up spring·····························
6-7-2. Adjusting intensity of the thread take up spring·····································
6-8. Adjustment of the thread tail after the trimming···········································
6-9 Adjustment of the air pressure·································································
7. VARIOS ADJUSTMENT·····························································
7-2. Adjustment of the detector position of the presser foot unit····························
7-3. How to replace with a special pressor foot·················································
7-4. Adjustment of the pressor foot holder position············································
7-5. Adjustment of the thread trimmer·····························································
7-5-1. Adjustment of the movable knife··························································
knife ····························································································
7-5-3. Adjustment of the holding pressure of the bobbin thread···························
7-5-4. Adjustment of the trimmer cam detector position·····································
7-6. Adjustment of the XY table detector·························································
7-6-1. Adjustment of X direction···································································
7-6-2. Adjustment of Y direction···································································
7-7. Adjustment of the Y timing belt tension·····················································
8. MAINTENANCE·······································································
8-1. Cleaning····························································································
8-2. Greasing····························································································
8-3. Disposing of oil waste···········································································
9. TROUBLESHOOTING·······························································
10. APPENDIX
10-1. The positional relationship between the sewing area and jig eject system
10-2. Air piping drawing
* Illustrations which attached in this manual might have slight differences from ones of real
product due to common using with other manuals or parts changing.
26
26
26
27
27
28
28
30
33
36
37
37
39
40
41
42
44
45
46
47
47
47
49
50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plk-j12060r

Table of Contents