Advertisement

Quick Links

imc CRONOS-SL/compact
Getting Started
© 2022 imc Test & Measurement GmbH
imc Test & Measurement GmbH • Voltastr. 5 • 13355 Berlin • Germany
Edition 8 - 2022-07-08

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the imc CRONOS-SL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Axiometrix Solutions imc CRONOS-SL

  • Page 1 CRONOS-SL/compact Getting Started Edition 8 - 2022-07-08 © 2022 imc Test & Measurement GmbH imc Test & Measurement GmbH • Voltastr. 5 • 13355 Berlin • Germany...
  • Page 2 STUDIO/imc WAVE installation medium in the folder "Products\imc DEVICES\OSS" or "Products\imc DEVICEcore\OSS". If you wish to receive a copy of the GPL sources used, please contact our Hotline. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 2...
  • Page 3: Table Of Contents

    5.1.1 Device models overview ........................... 32 5.2 DSUB-15 pin configuration ......................33 5.2.1 Universal plug ..............................33 5.2.2 Standard plug ..............................33 5.2.3 Special plug ............................... 34 © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 3...
  • Page 4 5.8.8 MVB-Bus (DSUB-9) ............................44 5.9 Pin configuration of the REMOTE socket ..................45 6 Symbols and legend ....................46 Index .......................... 47 © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 4...
  • Page 5: General

    The imc Test & Measurement GmbH is registered with the authority as follows: WEEE Reg. No. DE 43368136 valid from 24.11.2005 Reference https://www.imc-tm.com/elekrog-rohs-weee/ https://www.imc-tm.com/ce-conformity/ © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 5...
  • Page 6 Products not satisfying these requirements may only be used with special approval of the regulating body in the country where operated. All signal lines connected to imc CRONOS-SL/compact must be shielded and the shielding must be grounded. Note The EMC tests were carried out using shielded and grounded input and output cables with the exception of the power cord.
  • Page 7: Liability Limitations

    Notes / Quality Management Chapter 1 Industrial Safety We certify that imc CRONOS-SL/compact in all product configuration options corresponding to this documentation conforms to the directives in the accident prevention regulations in "Electric Installations and Industrial Equipment" (DGUV Regulation 3) .
  • Page 8: Guarantee

    The acclimatization period should take about 2 hours. This is especially recommended for devices without ET (extended environmental temperature range). We recommend a warm-up phase of at least 30 min prior to measure. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 8...
  • Page 9: Notes On Maintenance And Servicing

    The user must also ensure that any personnel assisting in the use of the device have also read and understood the instruction manual. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 9...
  • Page 10: Operating Personnel

    Do not accept the delivery or only accept it with reservations · Note the extent of the damage on the packing documents or on the delivery service's packing list. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 10...
  • Page 11: Transport

    To clean the slits use a small soft dry brush. · Do not allow liquids to enter the housing interior. · Be certain that the ventilation slits remain unobstructed. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 11...
  • Page 12: Start Of Operation Crc, Crsl

    8. Make sure that there is sufficient space at the ventilation slits. 9. Note that parts that are not explicitly intended to be carried may be warmer than the handles. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 12...
  • Page 13: Modularity

    For safety reasons high voltage modules (HV4U, HV2U2I etc.) are not to be changed by a customer! CRSL systems The devices of the imc CRONOS-SL (CRSL) series are factory configured devices. You can freely combine signal conditioning and digital I/O modules into one system. However, you cannot add new modules after delivery of an imc CRONOS-SL system, as for example with imc CRONOScompact.
  • Page 14: Power Supply

    In order to comply with Part 15 of the FCC-regulations applicable to devices of Class B, the system must be grounded. Grounding is also the condition for the validity of the technical specifications stated. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 14...
  • Page 15: Grounding With The Use Of The Included Power Adaptor

    The ground reference for the measurement device must then be established in a separate step. imc CRONOS-SL and imc CRONOScompact powered by an isolated DC-voltage source (e.g. battery) For running on an isolated DC power supply source (e.g. battery), either the grounding socket terminal, a grounding contact on the device ("CHASSIS"), or the CHASSIS contact on the imc signal plugs must be used.
  • Page 16: Shielding

    "POWER"-LED flashing (e.g. CRONOS-PL devices). To switch the device off, press the rocker switch down on the OFF-side (lower portion) for approx. 1 sec. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 16...
  • Page 17: Remote Control

    When the SWITCH and ON/OFF signals are bridged with a switch, the device remains permanently on. In this case, the main switch has no effect. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 17...
  • Page 18: Potential Difference With Synchronized Devices

    The incremental counter channels provide a supply voltage for external sensors, which is not protected and should be provided with an external fuse in order to be used! © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 18...
  • Page 19: Ups

    3 months that a device has not been in use (device must be switched on for charging). Do not deposit Li-ion batteries in domestic recycling containers! © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 19...
  • Page 20 (<10%) consists in the lowermost ("25") flashing at an even faster rate. The UPS Status LED is bicolor. In case of an error it flashes red. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 20...
  • Page 21 The following picture display the front of devices with integrated Li-ion batteries. The exact position of status LED can differ between each system. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 21...
  • Page 22: Removable Storage

    Status LED. On this topic, please read the notes in the section "Removable storage device" in the included documentation First Steps. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 22...
  • Page 23: Signal Connection

    5. The lid screws can be tightened Reference Pin configuration Please find the pin configuration of each available plug in the chapter: Pin configuration © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 23...
  • Page 24: Start Of Operation Software / Firmware

    Under some circumstances, this may require using switches to subdivide the network into separate segments in order to govern the data traffic in a targeted way and thus optimize the data rate. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 24...
  • Page 25: Connecting Via Lan In Three Steps

    Subsequently, a prompt appears asking whether to search for devices with an inappropriately configured network interface. Close this message box by clicking "Yes". © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 25...
  • Page 26 DHCP, the alternative values are used. These could lead to errors in the connection (different networks, same IP-addresses, etc.). © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 26...
  • Page 27 Now check whether the correct time zone is set for the device. For more info, see the description of the software manual under the keyword "Device properties". © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 27...
  • Page 28: Firmware Update

    Online Online-functions and hard drive controller Display Operating system of the connected displays Fieldbus Fieldbus interfaces (e.g. CAN etc.) Signal conditioners Amplifiers © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 28...
  • Page 29 Conclusion of the firmware update (example of a single device) Choose "Close". The device can now be used with the product software. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 29...
  • Page 30 You can call the Firmware-Update dialog manually. Ribbon View Setup-Configuration > Updating Firmware Complete The function is only to be used in compliance with instructions from the imc-Hotline. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 30...
  • Page 31: Pin Configuration

    Cable shielding must be connected at CHASSIS (DSUB frame) as a rule. At some plugs, (5 V) is available, with a maximum load current of typically 135 mA per plug. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 31...
  • Page 32: Device Models Overview

    Connecting DSUB-15 adaptor plug Chapter 5 5.1.1 Device models overview © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 32...
  • Page 33: Dsub-15 Pin Configuration

    [ ] : 1/4 Bridge with UNI2-8 and DCB2-8 * if special version with ±15 V option, then this pin 6 is the reference +SENSE with BR2-4 and UNI-4 © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 33...
  • Page 34: Special Plug

    The DI2-8 plug is used by the predecessor version DI-16. All of the plug's 8 bits share a common ground reference. 5.2.3 Special plug Metal plug Metal plug © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 34...
  • Page 35 AOUT2 BIT6 BIT7 HCOM BIT8 AOUT3 HCOM_1-4 AGND LCOM_1-4 DIN1 HCOM_5-8 AOUT4 LCOM_5-8 LCOM LCOM LEVEL OPDRN OPDRN CHASSIS CHASSIS CHASSIS CHASSIS © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 35...
  • Page 36: Teds Plug

    +IN4 -IN4 TEDS_GND TEDS_GND TEDS4 (+5V) (+5V) TEDS_GND TEDS1 TEDS1 TEDS2 TEDS2 CHASSIS CHASSIS TEDS3 CHASSIS CHASSIS TEDS2 TEDS3 TEDS1 TEDS4 CHASSIS © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 36...
  • Page 37: Dsub-26 Pin Configuration (High Density)

    +IN 16 -IN D -IN 20 -IN 24 -IN 28 -IN 32 -IN 4 -IN 8 -IN 12 -IN 16 Vcc ICP © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 37...
  • Page 38: Variety 2 X Dsub 37

    DSUB configuration of scanner SC2-32 Chapter 5 5.4.2 Variety 2 x DSUB 37 © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 38...
  • Page 39: Lemo Pin Configuration

    5 VDC/ 100 mA (optional 300 mA) -SUPPLY (GND) other sensor supply voltages available via the optional +INDEX sensor supply module +IN Y -IN Y © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 39...
  • Page 40: Dsub-9 Pin Configuration

    Pin configuration at measurement device. At the GPS-mouse Rx and Tx are interchanged. 5.7 APPMOD RS 232 RS 422 / RS 485 Full-Duplex RS 485 Half-Duplex Signal Signal Signal n.c. n.c. n.c. n.c. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 40...
  • Page 41: Pin Configuration Of The Fieldbusses

    B FlexRay ground BP channel A positive bus line channel A BP channel B positive bus line channel B © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 41...
  • Page 42: Xcpoe (Rj45)

    3B Tx2B sending channel 2B Rx4A receiving channel 4A Rx4A receiving channel 4A Rx4B receiving channel 4B Rx4B receiving channel 4B © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 42...
  • Page 43: Profibus (Dsub-9)

    5.8.7 PROFINET (RJ45) Pin configuration of the Signal network socket type modular 8P8C 4, 5, 7, 8 via RC to ground © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 43...
  • Page 44: Mvb-Bus (Dsub-9)

    Terminator A interna jumper to 2 Terminator B interna jumper to 4 Terminator B interna jumper to 5 Internal wiring for EMD connection © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 44...
  • Page 45: Pin Configuration Of The Remote Socket

    5.9 Pin configuration of the REMOTE socket Reference Remote control The assignment and the description of the modes can be found in the chapter "Start of operation ". © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 45...
  • Page 46: Symbols And Legend

    ... points out, concerning WEEE guideline, that the product may not be thrown in the domestic refuse. The product was brought into the market after 2005 August 13th. © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 46...
  • Page 47: Index

    Display of the PCs pin configuration ISO-9001 DSUB-26 connector DSUB-9 GPS-receiver LEMO power supply DSUB-Plug LEMO.1B.307 EMD (MVB-Bus) pin configuration © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 47...
  • Page 48 LEMO power unit UNI2 Power via CAN Telephone numbers: Hotline Precautions for operation PROFIBUS pin configuration uninterruptible power supply PROFINET pin configuration © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 48...
  • Page 49 Index uninterruptible power supply warm-up phase Warranty WEEE Restriction of Hazardous Substances XCPoE pin configuration © 2022 imc Test & Measurement GmbH imc CRONOS-SL/compact - Getting Started, Edition 8 - 2022-07-08 Page 49...

This manual is also suitable for:

Imc cronos compactImc cronos-sl2Imc cronos-sl4

Table of Contents