System Filling - Radiant R1C 24/B Installation, Use & Maintenance Manual

Premix condensing system boiler for remote d.h.w. storage cylinder connection
Table of Contents

Advertisement

1.1.10. SYSTEM FILLING

WARNING
For system filling use only clean tap water.
WARNING
If the system is filled by adding ethylene
glycol-type chemical agents you have to install on
the loading system a hydraulic trip unit in order to
separate the heating circuit from the domestic circuit.
Before powering up the boiler, fill the system as
follows:
1.
slightly loosen the cap of the circulator jolly
valve (1-fig. 1) to release the air from the
system;
2.
slightly loosen the cap of the jolly valve placed
on the top of the condensing block (fig. 3) to
release the air form the top of the system;
3.
open the feeding tap "R" (fig. 2);
4.
release all the air;
5.
use pressure gauge "M" (fig. 2) to make sure
that the system pressure reaches 1.2 bar (fig.
4);
6.
after performing this operation, make sure
that the loading tap "R" (fig. 2) is properly
closed.
16
R1C 24 /B - RAD - ING - Manuale - 2007.1_SK.3_MIAB3013_R7_VK42_B3
1. INSTALLATION
fig. 1
M
fig. 2
fig. 3
1
R

Advertisement

Table of Contents
loading

Table of Contents