Baxi 47 075 35 Installation & Servicing Instructions Manual page 4

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

All Gas Safe registered engineers carry an ID card with their licence number and a photograph. You can check your engineer is registered
by telephoning 0800 408 5500 or online at www.gassaferegister.co.uk
The boiler meets the requirements of Statutory Instrument " The Boiler (Efficiency) Regulations 1993 No 3083" and is deemed to meet the
requirements of Directive 92/42/EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous fuels:­
Type test for purpose of Regulation 5 certified by:
Notified Body 0085.
Product/Production certified by:
Notified Bodies 0085 & 0086.
For GB/IE only.
Legislation
This company declare that no substances harmful to health are contained 
in the appliance or used during appliance manufacture.
The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force, and only
used in a suitably ventilated location.
In GB, the installation must be carried out by a Gas Safe
Registered Installer. It must be carried out in accordance with the relevant requirements of the:
Gas Safety (Installation & Use) Regulations.
The appropriate Building Regulations either The Building Regulations, The Building Regulations (Scotland), Building Regulations
(Northern Ireland).
The Water Fittings Regulations or Water Byelaws in Scotland. 
The Current I.E.E. Wiring Regulations.
Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice. 
In IE, the installation must be carried out by a competent Person and installed in accordance with the current edition of I.S. 813  'Domestic
Gas Installations', the current Building
Regulations and reference should be made to the current ETCI rules for electrical installation.
All systems must be thoroughly flushed and treated with inhibitor (see section 6.2).
Codes of Practice ­ refer to the most recent version
In GB the following Codes of Practice apply:
Standard
Scope
BS 6891
Gas Installation.
BS 5546
Installation of hot water supplies for domestic purposes.
BS EN 12828
Heating systems in buildings.
BS EN 14336
Installation & commissioning of water based heating systems.
BS 6798
Installation of gas fired hot water boilers.
BS 5440 Part 1 Flues.
BS 5440 Part 2 Ventilation.
BS 7074
Expansion vessels and ancillary equipment for sealed water systems.
BS 7593
Treatment of water in domestic hot water central heating systems.
In IE the following Codes of Practice apply:
Standard
Scope
I.S. 813
Domestic Gas Installations.
The following standards give valuable additional information;
BS 5546
Installation of hot water supplies for domestic purposes.
BS EN 12828
Heating systems in buildings.
BS EN 14336
Installation & commissioning of water based heating systems.
BS 7074
Expansion vessels and ancillary equipment for sealed water systems.
BS 7593
Treatment of water in domestic hot water central heating systems.
page 4
Safe Manual Handling
General

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents