11-Installation - Haier HWF90ANB1 User Manual

Table of Contents

Advertisement

11-Installation

11.1 Preparation
Take the appliance out of the packaging.
keep them out of childrens reach. While opening the package, water drops may be
seen on plastic bag and porthole. This normal phenomenon results from water tests
in the factory.
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an environmen-
tally friendly manner.
11.2 OPTIONAL: Install noise reduction pads
1.When opening the shrink package,you will find four
noise reduction pads.These are used for reducing
noise(Fig. 11-1).
. 2
L
y a
h t
e
w
a
h s
hole pointing upwards, bottom side towards op-
3. Take out the noise reduction pads and remove the
double-sided adhesive protective film;paste around
the bottom; the noise reduction pads under the w-
ashing machine cabinet as shown in Figure 3(two
longer pads in position 1 and 3, two shorter pads in
position 2 and 4). Finally set the machine upright again.
11.3 Dismantle the the transportation bolts
The transport protection on the rear side is designed
for clamping anti-vibration components inside the ap-
pliance during transportation to prevent inner damage.
All elements (T1-T4, Fig. 11-2) must be removed before
use.
1.Remove all 4 bolts (T1 - T4) (Fig. 11-3).
General information and tips:
K eep the transportation bolts in a safe place for later use.
If the machine is to be moved to another location,replace
transportation bolts contrariwise to prevent damage.
2. Fill the transportation bolt holes with blanking plugs
(Fig. 11-4).
26
n i
g
m
a
h c
n i
e
d
o
w
n
o t
s t i
s
d i
e
p ,
r o
- t
2.
1.
3.
T3
T4
T1
T2
NZ AU
11-1
11-2
11-3
11-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hwf90an1Hwf80an1Hwf80anb1Hwf10an1Hwf10anb1

Table of Contents