Brickwork Of The Wall - Kohler K-25839T-NSHC Installation Instructions Manual

Wall-hung toilet
Table of Contents

Advertisement

2F� Brickwork of the wall
2F� 砌墙
1� Protection of inlet hole and drainage hole
1� 进、排水口防护
As shown, fixate the EPE block onto the drainage hole and
inlet hole.
如图将 EPE 挡块装在排污口和进水口上。
2� Brickwork wall thickness, follow: 1E Installations
of reserved access panel
2� 施工假墙厚度,按照步骤 1E:预留检修口安装
A. Press from front : Brickwork wall thickness 8~69mm from
the front of tank.
A. 前按:假墙厚度距水箱正面 8~69mm。
B. Remote installation: Brickwork wall thickness follow:
1E Installations of reserved access panel, remote
installation part of normal pneumatic faceplate
reserved access panel�
B. 远程安装:假墙厚度见 1E:预留检修口安装,常规气动面
板预留检修口的远程安装部分。
3. After finishing the brickwork of the wall, remove
protection of inlet hole and drainage hole
3� 砌墙后,取出进、排水口防护
After finishing the brickwork of the wall, take out the EPE
block, and eliminate unwanted mask with a sharp knife, if
there is mask.
Note: 1. Reserve access panel at front of the tank in remote
installation.
2. Do not remove and discard the mask cover before
installation of the water tank faceplate.
Foreign matters and dusts should be prevented
from entering the water tank during construction.
如图砌完墙后,将 EPE 挡块取出,然后根据需要,有方外罩
时用水口刀把方外罩多余的长度锯掉。
注:1. 远程安装时,水箱的前方预留检修口。
2. 方外罩遮板,安装水箱面板前请勿移除和废弃。
避免施工过程中异物及灰尘进入水箱。
1476533-K2-A
Inlet Hole
进水口
Drainage Hole
排污口
-25-
EPE Block
挡块
EPE
Mask
方外罩
Cover
遮板
EPE Block
挡块
EPE

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-29918t-nshc

Table of Contents