NEVER LEAVE THE HEATER UNATTENDED WHILE OPERATING!
NEVER LEAVE THE HEATER UNATTENDED WHILE OPERATING!
NEVER LEAVE THE HEATER UNATTENDED WHILE OPERATING!
Assembly
Installation:
&
Wall Mount Application
ToolsNeeded:
•
PowerDrill
•
4mmor5/32in.drillbit
•
PhillipsHeadScrewdriver
WARNING:USETHISHEATERONLYASDESCRIBEDINTHIS
MANUAL.ANYOTHERUSENOTRECOMMENDEDBYTHE
MANUFACTURERISSTRICTLYPROHIBITEDANDMAYCAUSE
FIRE,ELECTRICSHOCK,ORINJURYTOPERSONS.
•
Removetheheaterandallofthepackagingmaterialfrom
thebox.
•
Makesuretoremovethehardwarepackagefromthe
styromfoampackaging.
•
Checkallofthepackingmaterialforloosepartsandset
aside.
•
Thoroughlyinspecttheheaterfordamage.Ifanyisfound
donotcontacttheplaceofpurchase.Pleasecallthe
Manufacturerat800-251-0001.
Attaching Heater to Wall/Ceiling
1. Lineupbothholesonthebracketwiththeholesonthe
heaterhandle.
2. Attachtheheatertothebracketwiththe20mmscrewand
nut,10mmwasher,andlockingwasher.
3. Locatewoodstudinwallorjoistinceilingtomountheater.
Theselectedspaceshouldleaveenoughroomtomaintain
theclearancetocombustiblesoutlinedinthespecifications
tableonpage3.
Grounding Instructions:
Theheaterscoveredinthismanualaredesignedtobeinstalledand
servicedbyonlylicensedtrainedprofessionals.Heatersshouldonly
beinstalledonadedicated240voltcircuit.Thecordhasaplugas
shownbelow.Noadapterisavailableforthisbladeconfiguration,and
Mr. Heater Forced-Air Electric Workspace Heater
Figure2
Ceiling Mount Application
4. Useholesinthebrackettomarkholesfordrilling.
5. Onceholeshavebeenmarked,pre-drill2holesforscrews.
6. Securetwo65mmscrewstothewall/ceilingjoist,leaving
1/8'exposed.Thetwoscrewsmustbeattachedsecurelyto
awoodstud(min.1.5").
7.
Mounttheheaterbyattachingthebrackettotheexposed
screwheadsbyslidingthroughthekeyholesonthebracket
andpushingdowntolockthebracketintoplace.Itis
recommendthatyouhavehelpforthisstep.
8. Tightenthescrewsagainstthebrackettosecure.
WARNING:Heatermustbeattachedtoajoistwithminimum
of(2)screwsinopposingholes.
WARNING:Useappropriatefasteners.Thescrewsincluded
areforinstallinginwoodstudsonlyandarenotintendedfor
metaljoists.
WARNING:Becertainadjustmentscrewsaretightenedfirmly
tosecureheatertobracket.
SAVE THESE INSTRUCTIONS
IMPORTANT:Readallinstructionsandwarningscarefullybefore
installationanduse.Failuretofollowtheseinstructionsmayresult
inapossibleelectricshock,injurytopersons,firehazardandwill
noneshouldbeused.Thetypeoutletsa240(208)voltgrounding
outlet.WhenproperlyinstalledItprovidesagroundconnection
throughthecordtotheheatertopreventtheoperatorfromelectric
shock.Besurethattheelectricalreceptacleisoftheconfiguration
andcapacityappropriatefortheheater.
Figure3
4
Operating Instructions and Owner's Manual
voidthewarranty.