Operator Safety; Warning Note - Techne IFB-121 Operator's Manual

Industrial fluidised bath system
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 37
WARNING
Poor fluidisation causes hot spots, heater failure, and damage to other parts. Follow instruction book
carefully. For correct fluidisation, pay attention to;
INSTALLATION
Ensure bath is level and air supply is adequate.
OPERATION
Adjust air valve for even fluidisation.
Do not insert objects larger than recommended.
Ensure objects do not lie in contact with container wall or porous plate.
MAINTENANCE
Regularly inspect and maintain air filter to eliminate oil vapour in air supply.
ALUMINA
Should the fluidised bath be stirred for a long period of time under damp or humid conditions, moisture
may be absorbed by the alumina which is hydroscopic. To avoid violent fluidisation which occurs when
damp alumina is heated above 100°C, operate the bath for a period of approximately 8 hours at 90°C
prior to operation at elevated temperatures.
NEVER ADD COLD OR DAMP ALUMINA TO A HOT BATH AS THIS WILL ALSO CAUSE VIOLENT
FLUIDISATION WHICH CAN BE DANGEROUS. Allow the bath to cool then add the fresh alumina. If this
fresh alumina is a large portion of the charge then dry the whole charge as above.
FUME EXTRACTION
When used for processing items which may emit toxic or inflammable fumes, it is essential that an
adequate fume extraction system be installed. The extraction system must be correctly sized to ensure
that any toxic fumes are removed from the working environment.
To eliminate the risk of spontaneous ignition, the concentration of inflammable fumes above the bath
and within the exhaust duct work must be kept below the lower explosive limit.
17

Advertisement

Table of Contents
loading

Table of Contents