Points To Consider
Plan your installation before mounting any Allegro Linear 2.1 AC. The following
should be considered for a successful installation:
Weather conditions and ambient temperature of installation site.
Installation distances and appropriate cable lengths. Please consult your local Traxon™
office or authorized agent for necessary aid.
The number of Allegro Linear 2.1 AC and appropriate power sources.
Distance between each Allegro Linear 2.1 AC for thermal expansion.
Proper surge protection.
2.1.1
Installation Checklist
1.
Prepare cables and all necessary accessories.
2.
Perform functional check of Allegro Linear 2.1 AC. Take care not to damage cables/
connectors during pre-installation checks.
3.
Ensure all pre-installation checks laid out below have been followed.
4.
Mount the Allegro Linear 2.1 AC on-site. If the installation is to be left uncompleted
overnight, place all non-connected LED Engines and Allegro Linear 2.1 AC in an indoor
environment.
Ensure all the Interconnection Cables, Allegro Linear 2.1 AC and power
sources are initially stored in a dry area to guarantee the complete sealing of
the system from water before installation.
www.traxon-ecue.com
Installation Guide
©2023 TRAXON TECHNOLOGIES. ALL RIGHTS RESERVED.
07/23 V1.1
8 of 19

Advertisement

loading

This manual is also suitable for:

Allegro linear 2.1 ac rgbwAllegro linear 2.1 ac dwAllegro linear 2.1 ac sw (dmx)