Hardware Installation
Table 13: Installation Work flow (continued)
Steps
3
4
Verify the Box Contents
About This Task
The ExtremeCloud IQ Controller E3125 ships with everything needed for a basic
installation. Confirm that you have received the following items before you install your
controller.
Note
The power cord needs to be purchased separately for the respective
deployment country.
Procedure
1. Verify that the box contains the following items:
•
One E3125 Quick Reference Guide
•
One ExtremeCloud IQ Controller E3125 unit
•
Two shipping lock screws
•
One AC power cord bracket and retention strap kit
•
One rail mounting kit
•
One rail kit installation instruction sheet
2. Inspect the controller for any physical damage.
Contact
Action
Configure the controller. Do
one of the following:
•
Configure the
Management Interface
from the Console Port
•
Configure the
Management Interface
from the Management
Port
Connect the network
cables. Do one of the
following:
•
Connect the data ports
•
Install a Transceiver
Connect the network
cable.
Extreme Networks Support Portal
Purpose
Configure the following settings:
•
Admin Password
•
Host Attributes Settings
•
Time Settings
•
SNMP Settings
•
Data Plane Settings
Establish a network connection.
and
if there is any damage.
ExtremeCloud™ IQ Controller E3125
Verify the Box Contents
17