Dell EMC PowerSwitch S6100-ON Installation Manual page 19

Table of Contents

Advertisement

Figure 12. Switch with ground lug
NOTE:
For proper ventilation, position the chassis in an equipment rack or cabinet with a minimum of 5 inches (12.7
cm) of clearance around exhaust vents. The acceptable ambient temperature ranges are listed in the Environmental
Parameters section.
3. Attach the rack rails to the rack using four screws on the front of the rack and eight screws on the back of the rack.
Rack rail screws are not included.
Figure 13. Rack rails—rear view
Figure 14. Attach rack rails to rack—front view
NEBS compliance
19

Advertisement

Table of Contents
loading

Table of Contents