Electrical Wiring; Electrical Requirement - Fujitsu AirStage ASHA18GBCH Installation Manual

Hide thumbs Also See for AirStage ASHA18GBCH:
Table of Contents

Advertisement

6. ELECTRICAL WIRING

WARNING
Electrical work must be performed in accordance with this Manual by a person
certified under the national or regional regulations. Be sure to use a dedicated circuit
for the unit.
An insufficient power supply circuit or improperly performed electrical work can cause
serious accidents such as electric shock or fire.
Before starting work, check that power is not being supplied to the all units.
Use the included connection cables and power cables or ones specified by the
manufacturer. Improper connections, insufficient insulation, or exceeding the allowable
current can cause electric shock or fire.
For wiring, use the prescribed type of cables, connect them securely, making sure
that there are no external forces of the cables applied to the terminal connections.
Improperly connected or secured cables can cause serious accidents such as
overheating the terminals, electric shock, or fire.
Do not modify the power cables, use extension cables, or use any branches in the
wiring. Improper connections, insufficient insulation, or exceeding the allowable
current can cause electric shock or fire.
Match the terminal board numbers and connection cable colors with those of the
outdoor unit (or RB unit). Erroneous wiring may cause burning of the electric parts.
Securely connect the connection cables to the terminal board. In addition, secure the
cables with wiring holders. Improper connections, either in the wiring or at the ends of
the wiring, can cause a malfunction, electric shock, or fire.
Always fasten the outside covering of the connection cable with the cable clamp. (If
the insulator is chafed, electric discharge may occur.)
Securely install the electrical box cover on the unit. An improperly installed electrical
box cover can cause serious accidents such as electric shock or fire through exposure
to dust or water.
Install sleeves into any holes made in the walls for wiring. Otherwise, a short circuit
could result.
Install an earth leakage breaker. In addition, install the earth leakage breaker so that
the entire AC main power supply is cut off at the same time. Otherwise, electric shock
or fire could result.
Always connect the earth (ground) cable.
Improper earthing (grounding) work can cause electric shocks.
Install the remote controller cables so as not to be direct touched with your hand.
Perform wiring work in accordance with standards so that the air conditioner can be
operated safely and positively.
Connect the connection cable firmly to the terminal board. Imperfect installation may
cause a fire.
If the supply cable is damaged, it must be replaced by the manufacturer, its service
agent or similarly qualified persons in order to avoid a hazard.
CAUTION
Earth (Ground) the unit.
Do not connect the earth (ground) cable to a gas pipe, water pipe, lightning rod, or a
telephone earth (ground) cable.
Improper earthing (grounding) may cause electric shock.
Do not connect power supply cable to the transmission or remote controller terminals,
as this will damage the product.
Never bundle the power supply cable and transmission cable, remote controller cable
together.
Separate these cable by 50 mm or more.
Bundling these cables together will cause miss operation or breakdown.
When handling PCB, static electricity charged in the body may cause malfunction of
the PCB. Follow the cautions below:
• Establish an earth (ground) for the indoor and outdoor units and peripheral devices.
• Cut power (breaker) off.
• Touch metal part of the indoor units for more than 10 seconds to discharge static
electricity charged in the body.
• Do not touch terminals of parts and patterns implemented on PCB.

6.1. Electrical requirement

Voltage rating
Operating range
• Select the power cable type and size in accordance with relevant local and national
regulations.
• Specifications for local wiring power cord and branch wiring are in compliance with local
code.
• Max. wire length: Set a length so that the voltage drop is less than 2%. Increase the wire
diameter when the wire length is long.
Breaker should be installed at every refrigerant system. Do not use a breaker in a
different refrigerant system.
Refer to the table for the breaker specifications of each installation condition. Perform
the power crossover wiring within the range of the same refrigerant system. When the
crossover wiring is done, make a connection for indoor units to satisfy conditions A and
B below.
A. Current breaker requirements
Model
MCA
AS*A18GBCH
0.40 A
AS*A24GBCH
0.63 A
AS*A30GBCH
0.82 A
MCA: Minimum Circuit Ampacity
MFA: Maximum Fuse Ampacity
When the power crossover wiring is done, make it so that the total of the MCA of the
connected RB units and indoor units does not exceed the 15 A. For RB unit MCA, refer
to the RB unit installation manual.
If the capacity of connected RB units and indoor units exceeds the upper limit, either add
breakers or use a breaker with a greater capacity.
B. Earth leakage breaker requirements
Breaker capacity
30 mA, 0.1 sec or less
100 mA, 0.1 sec or less
* Heat pump type: indoor units, Heat recovery type: indoor units and RB units.
** If the total number of units connected to the breaker exceeds 44, either add a 30mA
breaker, or use breakers with a greater capacity.
6.1.1. Cable specifications
Recommended
cable size (mm
Power
2.5
supply cable
Transmission cable
0.33
Remote
controller cable
0.33 to 1.25
(2-wire type)
Remote
controller cable
0.33
(3-wire type)
*: Use shielded cable in accordance with local rules for remote controller cable.
230 V
198 to 264 V (50 Hz)
198 to 253 V (60 Hz)
MFA
20 A
* Maximum connectable "indoor units" or
"indoor units + RB units"
44 or less **
45 to 148
Cable type
Remark
2
)
Type245 IEC57
2 Cable + earth (ground)
or equivalent
22 AWG
LONWORKS
LEVEL 4 (NEMA) non-
compatible cable
polar 2 core, twisted pair
solid core diameter 0.65 mm
Sheathed PVC
Non-polar 2 core,
cable*
twisted pair
Sheathed PVC
Polar 3 core
cable*
En-6

Advertisement

Table of Contents
loading

Table of Contents