Installation; Unpacking; Tools And Supplies Needed - Hali-Brite HBM 150/2 L-801A Installation And Maintenance Manual

Airport rotating beacon
Table of Contents

Advertisement

4 Installation

WARNING: Allow only qualified personnel to perform the following tasks.
Observe and follow the safety instructions in this document and all other
related documentation.

4.1 Unpacking

Handle equipment very carefully to prevent component damage. Note any
exterior damage to the carton/crate that might lead to detection of equipment
damage. Open the top of the carton/crate. Remove foam packing from the top of
the box. Carefully lift the unit out of the box.
CAUTION: Do not lift the unit by the head. Failure to observe this warning
may result in equipment damage.
Unpack the carton/crate upon receipt and check the contents and their condition.
If you note any damage to any equipment, file a claim with the carrier
immediately. The carrier may need to inspect the equipment.

4.2 Tools and Supplies Needed

Equipment Required But Not Supplied
Wrenches
Set of Screwdrivers
Set of Pliers
Voltmeter
Insulation Tester
Level
Lightning Rod
Ground Wire (for lightning rod)
Liquid Glass Cleaner
S0-3 Cable, AWG 12, liquid-tight conduit and connectors
4.3 Installation
The HBM 150/2 rotating beacon comes completely assembled except for
installation of a customer-supplied AWG 12, S0-3 power cord.
4.3.1 Mounting
Open the front door on the cabinet. Inspect the interior to make sure all parts are
tight and have not been loosened in shipment. Close the door and tighten the
latches.
9
HBM 150/2 Installation and Maintenance Manual

Advertisement

Table of Contents
loading

Table of Contents