Start-Up And Operations - Pilot Air ALTA-TEC Series User’s Maintenance & Spare Parts Manual

Variable speed rotary screw
Hide thumbs Also See for ALTA-TEC Series:
Table of Contents

Advertisement

1
CHECKS TO BE CARRIED OUT PRIOR TO START-UP
N.B.: The customer is responsible for installing the machine and making the required
electrical and air connections.
Initial system start-up must be carried out by skilled personnel who will make the various
checks required and follow the respective instructions.
Each machine was thoroughly tested at the plant before shipping.
You should monitor the compressor during the first hours of operations to check for faults.
Follow the installation prescriptions given in the previous chapters
Remove all packaging materials and tools
Connect the compressor to the distribution line as shown in paragraphs.
Check the oil level in the tank: refer to section: "Maintenance, Oil Control and Topping Up." In the
event of low oil level, top up with FSN Original Oil.
Check for correspondence between the compressor plate data with the actual specification of the
electrical system. A variation of ± 5% with respect to the rated value is allowed.
Connect the machine to the electrical system as described in the previous chapters.
Compliance with the correct voltage phase
sequence is fundamental since this defines the
direction of rotation of the motor. The direction
of rotation must be that indicated by the
adhesive label located to the side of the screw
unit (see picture).
Note that even a few seconds of incorrect
rotation may cause serious damage.
A phase sequence checking device to prevent
mistakes is fitted in the electrical panel.
Now the machine is ready to go.
Before starting the machine, read the following
sections and the chapter on maintenance
operations for in depth knowledge of the
machine.
14 |
P a g e
Start-Up and Operation
Alta-Tec 31-38VS Rev 01 02-01-2020