Proceeding due to the following instruction guarantees the correct usage and safety. In case of any doubts please contact Reventon Group sp. z o. o. [Ltd.]. The supplier reserves the rights to make changes to the technical documentation without previous notice.
3. INSTALLATION a) wall mounting 3.1. GENERAL PRINCIPLES - unscrew the fixing screws to remove the mounting plate from the back of the main body The following figures show minimum distances between the air curtain and the building partition: - install mounting plate on the wall -install the main body.
- maintenance and repair work must be carried out by a qualified personnel 6. CONTROL familiar with local regulations and standards The device can operate in cooling mode (heaters are turned off, the mode - always unplug or disconnect the appliance from the power supply before is signilised by green diode) or in one of three heating modes - the low one (I heating level, it is signilised by one red diode), the middle one (II heating level, installation, servicing or cleaning the unit...
Page 5
8. TERMS OF WARRANTY I. Supplier Reventon Group Sp. z o.o. [Ltd.] grants the buyer a 24-month warranty period for the following devices: - electric heated air curtain AERIS 100EN-1P II. The terms of warranty are valid from purchasing the device (i.e. invoice / another confirming document issue date) but not longer than 30 months from leaving the supplier's warehouse.
Page 6
Warranty card Reventon Group Sp. z o.o. [Ltd.], 556 Wyzwolenia Street, 43-340 Kozy, Poland...
Page 7
Reventon Group Sp. z o.o. [Ltd.], 556 Wyzwolenia Street, 43-340 Kozy, Poland, www.reventongroup.eu...
Need help?
Do you have a question about the AERIS 100EN-1P and is the answer not in the manual?
Questions and answers