Flow Connections For A Single (Isocratic) Preparative Pump - Agilent Technologies 1200 Series User Manual

Preparative pump
Hide thumbs Also See for 1200 Series:
Table of Contents

Advertisement

3
Installing the Pump

Flow Connections for a Single (Isocratic) Preparative Pump

Flow Connections for a Single (Isocratic) Preparative Pump

Tools required
Wrench 1/4 - 5/16 inch for capillary connections
Parts required
#
1
Preparations
Pump is installed in the HPLC system
When opening capillary or tube fittings solvents may leak out.
WA R N I N G
The handling of toxic and hazardous solvents and reagents can hold health risks.
Danger of Explosion
WA R N I N G
Pumping solvents at high flow rates generally results in electrostatic charging of
the solvents, which may result in the potential ignition of flammable vapors or
solvents.
42
Part number
Description
Other modules
G1361-68708
Parts from basis kit (see
Please observe appropriate safety procedures (for example, goggles, safety gloves
and protective clothing) as described in the material handling and safety data sheet
supplied by the solvent vendor, especially when toxic or hazardous solvents are
used.
To avoid electrostatic discharge, never use the pump without grounded metal
solvent bottles.
Do not use metal bottles without appropriate grounding!
Table 8
on page 32)
Agilent 1200 Preparative Pump User Manual

Advertisement

Table of Contents
loading

Table of Contents