Download Print this page
Airflow QT 120B Installation And Operating Instructions

Airflow QT 120B Installation And Operating Instructions

Quietair 100mm/120mm axial fan

Advertisement

Quick Links

9041550_Model_QT_100_120B 30/06/2010 11:29 Page 1
Warranty:
Applicable to units installed and used in the United Kingdom. Airflow's Warranty covers the QuietAir fan for TWO years. The Warranty can be upgraded to THREE years from date of
purchase against faulty material or workmanship by registering on our web site at www.airflow.com.
The Warranty covers the product only and not the installation cost..
In the event of any defective parts being found, Airflow Developments Ltd reserve the right to repair or at our discretion replace without charge provided that the unit
1. Has been installed and used in accordance with the fitting and wiring instructions supplied with each unit
2. Has not been connected to an unsuitable electrical supply
3. Has not been subjected to issue, neglect or damage.
4. Has not been modified or repaired by any person not authorised by Airflow Developments Ltd.
5. Has been installed in accordance with latest Building Regulations and IEE wiring regulations.
Airflow Developments shall not be liable for any loss, injury or other consequential damage, in the event of a failure of the equipment or arising from, or in connection with, the
equipment excepting only that nothing in this condition shall be construed as to exclude or restrict liability for negligence.
This warranty does not in any way affect any statutory or other consumer rights.
Airflow Developments Limited
Aidelle House, Lancaster Road, Cressex Business Park
High Wycombe, Buckinghamshire
HP12 3QP, United Kingdom
E-mail: info@airflow.co.uk
Telephone: +44 (0) 1494 525252
Facsimile: +44 (0) 1494 461073
airflow.com
Installation and Operating Instructions
QuietAir 100mm/120mm Axial Fan
MODEL:QT 100B - Two Speed Fan (75/90m
QT 120B - Two Speed Fan (150/170m
• Basic Switching
• Low Energy
• Whisper Quiet
• Long Life
• Extra Safe
80001422 Issue 3 07/23
3
/hr)
3
/hr)

Advertisement

loading
Need help?

Need help?

Do you have a question about the QT 120B and is the answer not in the manual?

Questions and answers

Summary of Contents for Airflow QT 120B

  • Page 1 5. Has been installed in accordance with latest Building Regulations and IEE wiring regulations. Airflow Developments shall not be liable for any loss, injury or other consequential damage, in the event of a failure of the equipment or arising from, or in connection with, the •...
  • Page 2 9041550_Model_QT_100_120B 30/06/2010 11:30 Page 3 Installation and Operation Instructions QuietAir 100B & QuietAir 120B Contents Important information CHAPTER 1 To ensure safety and correct operation please read and observe the following instructions carefully before proceeding. The electrical connection must be fully isolated from the supply up to the final assembly ! Keep the installation and INSTALLATION AND operating instructions as a reference at the device.
  • Page 3: Scope Of Delivery And Assembly

    9041550_Model_QT_100_120B 30/06/2010 11:30 Page 1 Installation and Operation Instructions Installation and Operation Instructions 1.10 Electrical connection Wall or ceiling installation WARNING All work must be carried out with the equipment fully isolated from the power supply. The electrical connection are to be carried out in accordance with the relevant wiring diagram and are only to be done by a certified elec- trician.
  • Page 4: Cleaning And Maintenance

    9041550_Model_QT_100_120B 30/06/2010 11:30 Page 3 Installation and Operation Instructions Installation and Operation Instructions Wiring diagram overview Electrical connection CHAPTER 4 QuietAir 100B - 75 (90)m All work must be carried out with the equipment fully isolated from the power supply. The electrical connection SS-930 QuietAir 120B - 150(170)m ELECTRICAL...
  • Page 5 Addendum – 10/2016 The Building Regulations 2010, Statutory Instrument Part 9, paragraph 42, imposes a requirement that testing and reporting of mechanical ventilation performance is conducted in accordance with an approved procedure. Compliance with this requirement by an assessed and registered ‘Competent Person’ should follow a ‘Best Practice’...

This manual is also suitable for:

Qt 100b