Download Print this page

Operation - Wire wizard NSW-20.4F-18B-2 Installation & Operation Manual

Advertisement

TORCH WIZARD INSTALLATION & OPERATION MANUAL

4.0 OPERATION

1
Join the end wire from drum 1
with the start wire from drum 2
using the Butt Welder. Follow butt
welding instructions on page 5.
2
Remove the burr in the wire joint
using the Wire Sizer (recommended
accessory). Alternatively, you may
remove the burr in the wire using a
rotary tool with a stone bit.
3
6
DRUM SETUP
Wire Clamp
If using with wire over 0.052 (1.3
mm), disassemble and flip the
clamping block around to the
textured side for better gripping
DRUM 1
Start
Wire
Adjust wire bridge so it
is in the proper position
(see page 5). Push in
spring clamp on the
wire bridge and insert
wire along the groove
between the two drums.
Release spring clamp to
hold wire in place.
4
Wire Pilot™ Feed
Assist option
DRUM 2
Start
Wire
End
Wire
When wire from drum
1 runs out, the transfer
arm will switch over to
drum 2. Simply replace
empty drum and repeat
steps 1-3. Flip the wire
bridge when changing
drums so the spring
clamp side is always
opposite the side of the
active drum.

Advertisement

loading

This manual is also suitable for:

Nsw-20.4f-18b-4Nsw-sc24-18b-2Nsw-sc24-18b-4