Purge Box Units Purge-Box 100 Purge-Box 200 For Purge Ventilation with Low Energy DC Motor - for domestic and commercial use used 90mm x 220mm ducting Installation, Operating and Maintenance Instructions...
Page 2
TO PERSONS OR PROPERTY DUE TO IMPROPER USE WITH REFERENCE TO THE PRECAUTIONS OUTLINED IN THIS MANUAL. THIS MANUAL MUST ALWAYS BE READILY AVAILABLE. Purge-Box 100: 90mm x 220mm, up to 188 l/s at 50Pa, max capacity 200 l/sec Purge-Box 200:...
Document F1 2006 for guidance) OPERATION Purge Box units are suitable for ceiling or wall installation as stand alone units or in conjunction with a Vectaire MVHR system. In order to comply with Construction (Design & Man agement) Regulations, sufficient access for safe maintenance (recommended on an annual basis), or removal following installation, MUST be provided for this product.
Page 5 CLEANING AND MAINTENANCE Before carrying out any maintenance or cleaning operations the mains electrical supply MUST be disconnected. CLEANING AND MAINTENANCE SHOULD BE CARRIED OUT BY A QUALIFIED PERSON Before attempting to remove the motor impeller assembly disconnect the cable by removing the terminal block inside the control box.
Page 6
N.B For all other commissioning (including Humidistat on "H" models), the jumper should be in the factory default position - i.e POSITION 2 Vectaire Ltd, Lincoln Road, Cressex Business Park, High Wycombe, Buckinghamshire, HP12 3RH Tel: +44 (0)1494 522333. Fax: +44 (0)1494 522337. Email: sales@vectaire.co.uk E & O.E...