Operation of the utonomous control unit (16 pages)
Summary of Contents for Geco G-403-P04
Page 1
P.P.U.H. „Geco” spółka z o.o. 30-134 Kraków ul. Zarzecze 112 A tel. 012 6369811, 6361290 fax. 012 6362002 SERVICE & OPERATING INSTRUCTIONS FOR AUTONOMOUS CONTROL UNIT G-403-P04 TO CONTROL SYSTEMS WITH SOLAR COLLECTORS version 02 Please read these instructions very carefully before connecting and starting any of our equipment.
Page 2
PPUH „GECO” Sp. z o.o. 2ND EDITION FROM 2004-09-20...
CONTENTS: GENERAL CHARACTERISTICS..................4 TECHNICAL DATA .......................4 ELECTRIC INSTALLATION AND THE RULES OF CONNECTION ......5 OPERATION AND THE METHOD OF CONTROL OF SBR G-403-P04 ......5 4.1. M ..................5 EASUREMENT OF TEMPERATURE 4.2. D .................5 ISCONNECTION OF THE FEEDING VOLTAGE OPERATION OF G-403-P04....................6 5.1.
An autonomous control unit G-403-P04 is used to control pump operation and to stabilise temperature in systems with solar collectors. The G-403-P04 controller is a convenient, modern and easy to operate unit. It was made using a microprocessor technology with automatic surface installation.
ALL REPAIRS must be done when power is disconnected on the fuse!!! Caution!!! Additional equipment may be connected to the G-403-P04 controller only by a person authorised to do electric installation works. 4. OPERATION AND THE METHOD OF CONTROL OF SBR G-403-P04 4.1.
OPERATING MANUAL G-403-P04 PAGE 6 5. OPERATION OF G-403-P04 5.1. Activation of the unit 1. Connect the unit to mains (put the plug in a socket). First, four dots will appear on the display; then a factory program version will be seen, four dots followed by four horizontal dashes (----) which signal that the unit is in a stand-by position.
When temperature in the isothermal tank defined in the ‘u1’ parameter is exceeded (a standard temperature is C) the engine of the PK collector pump is switched off unconditionally. PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
The type of the controller depends on the needs of installation in which it is to operate. To change the configuration of the type of the controller, do as follows: 1. Switch off the controller with the button Four horizontal dashes will appear on the display. PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
Page 9
1. THE PRODUCER IS OBLIGED TO INTRODUCE NEW PARAMETERS WHICH ARE NECESSARY FOR NORMAL OPERATION OF THE UNIT! 2. When the unit is programmed and started up its operation and correctness of the setting of user parameters should be checked. PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
In this system the collector pump functions in accordance with the description in item 5.3 and the PKT boiler pump is an additional pump. It will be connected if the sensor temperature T3 is lower than the temperature set by the user in the parameter ‘u2’. PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
‘u4’ – (range 0-10 min): duration of the break in operation of PK main pump in order to test temperatures in relation to reheating of water in the isothermal tank (when ‘u4’=0 no test is done) PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
(switching of the ZT valve)! Time of the interruption is set in user parameter ‘u4’ (where 0 means no interruptions if no testing of this condition is done). 8.5. A system with two collectors collect feed Fig. 5 PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
(T2) and floor heating (T3) is a positive figure and is higher than the value defined by the user in the ‘u3’ parameter and the maximal temperature of floor heating (T3) set by the user in the ‘u2’ parameter has not been exceeded. PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
Page 14
. + 4 8 ( 1 2 ) 6 3 6 2 0 0 2 for a temperature controller e - m a i l : geco@geco.pl type G-403-P04 http://www g e c o . p l I.
Page 15
SBR DAMAGE DETAILS: ......................................................................................................................................................................................................................................................................................................................................................................................................................Date and place of repairs Serviceman signature requirement reporting and servicing station seal PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
• the condition of feeding couplings • whether feeding couplings are tightened up • whether the connection of the performing module with the control panel is correct • connect another band PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
Page 17
OPERATING MANUAL G-403-P04 PAGE 17 Declaration of Conformity CE P.P.U.H. Geco sp. z o.o. Ul. Zarzecze 112A 30-134 Kraków declare with full responsibility that the product: controller G-406-P… conforms with provisions of the following directives: 73/23/EEC, 93/68/EEC 89/336/EEC, 92/31/EEC, 93/68/EEC...
Page 18
OPERATING MANUAL G-403-P04 PAGE 18 PPUH „GECO” Sp. z o.o. 2ND EDITION from 2004-09-20...
Page 20
P.P.U.H. „Geco” spółka z o.o. ul. Zarzecze 112 A 30-134 Kraków POLAND tel. 012 6369811, 6361290 fax. 012 6362002...
Need help?
Do you have a question about the G-403-P04 and is the answer not in the manual?
Questions and answers