HADEF 32/20EX Installation, Operating And Maintenance Instruction page 16

Monorail trolley
Table of Contents

Advertisement

15
Remedy
Problem
Trolley runs very slowly or not at all
*) as far as applicable
16
Decommissioning
WARNING!
It is essential that the following points are observed in order to prevent damage to the equipment or critical
injury when the device is being decommissioned:
It is mandatory that all steps for decommissioning the machine are carried out in the indicated sequence:
 First secure the working area for decommissioning, leaving plenty of space.
 Read the chapter "Safety instructions".
 Disassembly is carried out in reverse order to the assembly.
 Please make sure that all operating material is disposed of in accordance with environmental regulations.
16.1
Temporary decommissioning
 Measures are as above.
 Also read the chapter "Transport and storage".
16.2
Final decommissioning/disposal
 Measures are as above.
 After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out
in accordance with environmental regulations.
16
Cause
Driving pinion dirty or blocked.
Hand chain is twisted or blocked*)
Remedy
Clean the driving pinion and lubricate it, if necessary,
exchange worn parts
Place the hand chain correctly
5.52.693.01.01.00

Advertisement

Table of Contents
loading

Table of Contents