8.1.2 Substation Mounting

24 GridShield® 3P
To install a 3P/3SP style recloser in a substation
substation mount
(top view)
frame (see figures 24 to 30), follow these steps:
1.
Attach the lifting brackets to the substation
25 GridShield 3P
substation mount base
frame. Use a crane and the provided lifting
bracket to lift the frame off the pallet and
26 GridShield 3P
substation mount
move it to the desired position.
(side view 1)
Do not use a forklift to move the substation
frame or the recloser.
2.
Securely bolt the frame to the concrete
pad. Adjust the upper portion of the frame
to the desired height. The frame allows
for adjustments in 3-inch increments.
24
25
3.
Remove the lifting brackets from the frame
and attach them to the sides of the recloser.
If you are using a 3SP unit, use the lifting
straps around the individual pole body.
4.
Lift the recloser (or the poles if it is a 3SP unit)
over the top of the frame and carefully lower
it into place (see figure 3).
5.
Bolt the control cabinet to the cross members
on the side of the substation frame.
6.
Ensure that all hardware is securely tightened.
Do not exceed 50 lbs. cantilever force
on any of the terminals in any direction.
Failure to comply will result in permanent
damage to the recloser.