Download Print this page

Set-Up Preparation; Valve Operation - Master Marvin Owner's Manual

Paddleboard

Advertisement

Available languages

Available languages

1. Unfold the board from the packaging.
Choose a smooth and clean surface to unfold board. Roll out the SUP
board until it is laying flat with top side facing up.

2. Valve operation

Follow the instructions below for valve operation and correct
inflation and deflation procedures.
The board's inflation valve is located near the nose of the board. To
close off the valve for inflation, make sure that the center valve pin is
in the "UP" position. If it is in the "DOWN" position, press the valve
pin to "UP" position.
To open the valve for deflation, press down on the valve pin (need
not to turn it), make sure that the center valve pin is in the "DOWN"
position,
Be careful of any sand or debris around the valve area when

SET-UP PREPARATION

EN

Advertisement

loading

This manual is also suitable for:

Aqua elfinShark-10