Preparing Points For Hanging - Brant Radiant Heaters QTS Series Manual

Gas-fired infrared quad tube heater
Table of Contents

Advertisement

QTS
Series

Preparing Points for Hanging

1
Transfer the heater's three hanging locations to the ceiling where the unit is to be installed and mark
hanging points.
2
Prepare mounting surface. If necessary attach additional support blocks and drill holes (Figure 3.5).
3
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
4
Attach and close S-hook (P/N: S-HOOK) and #1 double-loop chain (P/N: THCS) to anchor. Check
that it is securely attached. NOTE: Threaded rod and turnbuckles may be used.
NOTE: The unit must be in straight alignment and level. Adjust chain lengths until radiant tubing is level
and equal weight distribution is achieved. Chains must be straight up and down. Do not install chains at
an angle as this can result in tube warpage or separation.
Figure 3.5
Hanging Types
Support
Blocking
I-Beam
Threaded Rod and
Turnbuckle
3.0
Installation
Preparing Points for Hanging
Concrete
Beam
Screw Hook
S-Hook and #1
Double-Loop Chain
Beam Clamp
I-Beam
15
Hanging Types
Wood
Beam
Support
Blocking
Beam Clamp
S-Hook and #1
Double-Loop Chain
Turnbuckle

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qts-40nQts-40pQts-60nQts-60pQts-80nQts-80p

Table of Contents