3.0
Installation
Heater Assembly
Installing the Reflector Assembly
NOTE: Prior to installing the reflector, relocate the saw horses to support the burner control box and the
tubes beneath the u-end reflector.
1
Align the reflector end cap holes (2) with the corresponding burner control box studs (see Detail
'C'-Step 1). NOTE: Do not remove the existing nuts on studs.
2
. Lower the U-end reflector end cap (TP-6084A) down over the tubes while shifting the reflector
assembly towards the burner control box. (see Detail 'C'-Step 2).
3
Secure burner reflector end cap (TP-6085A) with (2) 5/16"-18 keps nuts (see Detail 'D'). Note: The
burner reflector end cap does not have a tab with slots.
4
Secure the U-end reflector end cap using the red shoulder screws (TP-6086A) provided (see Detail 'E').
5
Repeat process with remaining reflector assembly.
Venting Installation
1
Insert vent adapter (TP-6080) into vent pipe (TP-6075) and secure with (3) self-drilling screws (TP-13).
2
Install venting assembly and secure to vent outlet with (3) self-drilling screws (TP-13) (See Detail
'C'-Step 3). See page 18 for additional venting requirements.
Figure 3.4
Final Heater Assembly
DETAIL 'C'
Step 2
Step 3
Preparing Points for Hanging
Step 1
DETAIL 'D'
Secure burner reflector end cap
(TP-6085A) with (2) 5/16"-18 keps
nuts per assembly.
14
QTS
Vent Outlet
DETAIL 'E'
Secure the U-end reflector end cap
using the #8 x 1/2" red shoulder screws
(TP-6086A). Two per assembly.