Download Print this page
HABONIM C47C Installation, Operating, Maintenance

HABONIM C47C Installation, Operating, Maintenance

Cryogenic valves series

Advertisement

Quick Links

Installation, Operating & Maintenance
Cryogenic Valves Series
C47C, FC47C, FC47W
Fire-Safe (FC) and non Fire-Safe
Sizes included:
½" - 6" (DN15 - DN150)
Habonim ISRAEL
Tel: +972-4-6914911 / 6914903
Fax: +972-4-6914935
sales_international@habonim.com
Habonim USA
Toll Free Phone: 1-866-261-8400
Toll Free Fax: 1-866-243-9959
sales_usa@habonim.com
Inspired By Challenge
1. GENERAL
This Installation, Operating & Maintenance manual covers the
instructions required for safe use of Habonim cryogenic ball valve.
Before using a valve, read the entire IOM carefully and make sure
you understand everything.
WARNINGS & SAFETY INSTRUCTIONS
Habonim cannot anticipate all of the situations a user
may encounter while installing and using Habonim
valves. The user MUST know and follow all applicable
industry specifications on the safe installation and use of
these valves. Misapplication of the product may result in
injuries or property damage. Refer to Habonim product
catalogues, product brochures and installation, operating
and maintenance manuals for additional product safety
information or contact Habonim technical service.
1. Keep hands and objects away from the valve ports at
all times. Actuated valves could be accidentally
operated, resulting in serious injury or valve damage.
2. Before removing a valve from the line always make
sure the line has been depressurized and drained.
3. Utmost caution must be taken when handling a valve
that has toxic, corrosive, flammable or a contaminant
nature media flowing through its pipeline. The
following safety precautions are recommended when
dismantling valves with hazardous media:
a. Wear eye shield, protective headgear, clothing,
gloves and footwear.
b. Have available running water.
c. Have a suitable fire extinguisher when media is
flammable.
4. Do not try to operate a valve that exhibits any sign of
leakage. Isolate the valve and either repair or replace it.
5. Do not use or substitute non Habonim components or
parts in Habonim valves and assemblies.
Habonim UK
Habonim China
Tel: +44-1633-484554
Tel: + 86 21 64453190 *146
Fax: +44-1633-482252
Fax: + 86 21 64453191
sales_uk@habonim.com
sales_china@habonim.com
Habonim Australia
Tel: +61 3 9556 5428
sales_au@habonimau.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the C47C and is the answer not in the manual?

Questions and answers

Summary of Contents for HABONIM C47C

  • Page 1 1. GENERAL This Installation, Operating & Maintenance manual covers the Fire-Safe (FC) and non Fire-Safe instructions required for safe use of Habonim cryogenic ball valve. Before using a valve, read the entire IOM carefully and make sure you understand everything.
  • Page 2 • Acidic media PH < 5 or alkaline media PH > 9 exceeded. Habonim recommend a proof test interval of 12 months; in case of Valve surface temperature may become extremely cold due to Fail to Open ESD system, a partial stroke is acceptable to confirm operating conditions.
  • Page 3: Installation

    CE mark 6.2.5. If "back-welding" is required on screwed valves, refer to the INDUSTRIAL VALVES & ACTUATORS LTD Body material KFAR HANASSI, 1230500 IL instructions for Weld End valves or to the "Habonim Welding Valve size 1155 BODY Ball material Instructions"...
  • Page 4: Operation

    7.2. Habonim Cryogenic Valves provide tight shut off when used in accordance with Habonim published pressure/temperature chart. If these valves are used in a partially open (throttled) position, seat life may be reduced.
  • Page 5: Maintenance

    GENERAL valves sizes 1 ⁄ 2” to 2-1/2” (or 2” full bore). 8.1.1. HABONIM valves have a long and trouble free life, and 8.2.1. Cycle the valve with the line pressure fully relieved before maintenance is seldom required. When maintenance is attempting to remove the valve from the pipeline, to insure necessary, valves can be refurbished on site.Rotate the...
  • Page 6 8.3.6. Thread the gland nut onto the stem. Tighten the gland nut to TABLE 1 the torque figures (table 1). Gland Nut Tightening Torque For C47C, FC47C and 8.3.7. Place the locking clip on the gland nut by adjusting the FC47W orientation of the nut (in the clockwise direction).
  • Page 7 8.3.31. Tighten the body bolts to the torque figures (table2), and according to tightening pattern illustrated in figure 6. 8.3.32. Leave the valve in the open position for flushing the line. TABLE 2 Body Bolts Tightening Torque For C47C, FC47C and FC47W Tightening Torque Reduced Bolt Full Bore...
  • Page 8 A167 304 * Repair kit components C47C series is Habonim's standard valve design without the HermetiX™ stem seal construction. ** Only with HermetiX™ fire safe design This material can only be used as part of the C47C design. C47C, FC47C, FC47W...
  • Page 9 A167 304 C47C series is Habonim's standard valve design without the HermetiX™ * Repair kit components stem seal construction. ** Only with HermetiX™ fire safe design This material can only be used as part of the C47C design. C47C, FC47C, FC47W...

This manual is also suitable for:

Fc47cFc47w