Download Print this page

Mars Confort-Aire Century VCD18 Series Installation Manual page 12

Hyper heat single zone air handler & condenser

Advertisement

CAUTION
A field-fabricated secondary drain pan, with a drain pipe to the outside of the building, is required in
all installations over a finished living space or in any area that may be damaged by overflow from the
main drain pan. In some localities, local codes may require a secondary drain pan for any horizontal
installation.
Selection of installation direction
Different installation directions
The units can be installed in a vertical (down and up)and Horizontal(right and left) configuration.
Vertical up
Airflow direction of different installation directions
Upflow
NOTICE
Vertical up and horizontal left installation does not need to change the direction of evaporator.
Horizontal
Downflow
11
11
Installation and Operation Manual - VCDxxSA
Installation and Operation Manual - VCDxxSA
NOTICE
For horizontal installation,
a secondary drain pan(not
supplied)must be installed.
At least
18in(46cm)
Horizontal left
Horizontal right
11

Advertisement

loading