Transport And Storage; Delivery; Transport; Storage - deconta C 25 L Instruction Manual

Water management system
Hide thumbs Also See for C 25 L:
Table of Contents

Advertisement

Water Management Boiler system C 25 L

2.1 Delivery

If no other agreements have been made, the unit is packed safely and will be delivered
ex work. Transport damages have to be immediately documented by the carrier or
another supplier. Please also note the possible damages on the way bill.

2.2 Transport

The Transport is to be proceeded with care to avoid damages by improper handling or
carelessness.
It is important to avoid exposure to violent shocks, otherwise the function and safety of
the unit cannot be guaranteed. In winter and at risk of frost, the whole unit (Pump, filter
housing and tank) needs to be emptied before transport.
Attention: Transport of unit (also relocation) only when empty.

2.3 Storage

In order to avoid damages, the installation has to be kept in a dry area with no access for
unauthorized persons.
Because of risk of frost in winter it is important to observe the following:
 Empty water hoses, filter housing, tank and pumps
 Place Water Management in a frost-protected area
Advice for the draining of the tank: To drain remove cap "empty tank" and tilt valve.
Instruction manual

2 Transport and storage

Valve
Cap
Empty tank „OUT"
Seite 4

Advertisement

Table of Contents
loading

Table of Contents