Front Panel Operation - INSIGHT DLP DIRECTOR 1000 Hardware Installation Manual

Hide thumbs Also See for DLP DIRECTOR 1000:
Table of Contents

Advertisement

10. Front Panel Operation

Press the Power Button once to power the appliance on.
A
A
B C D E F
B C D
H I
H I
A
System ID Button with Integrated LED
B
NMI Button (recessed, tool required for use)
C
SPAN Activity LED
D
eth3 Activity LED
E
System Cold Reset Button
F
Hard Drive Activity LED
G
Power Button with Integrated LED
H
MGMT Activity LED
I
DLP Activity LED
INSIGHT DLP DIRECTOR 1000 & 2000 Appliance Hardware Installation Guide
E F
G
G
System
System
Status LED
Status LED
See Detail Illustration and
See Detail Illustration and Chart
See Detail Illustration and
for Front Panel Information
for Front Panel Information
for Front Panel Information
USB Ports
USB Ports
Video Port
Video Port
System Status LED
There is a bi-color (Green/Amber) LED on the Front Panel (shown on
the left). The LED operation is defined in the following table.
LED Color
System State
OFF
System is not operating
GREEN
Solid - On
GREEN
~1 Hz blinking
AMBER
~1 Hz blinking
AMBER
Solid - On
Chart
2
4
1
3
ID
Criticality
Not ready
OK
Degraded - system is
operating in a degraded state
although still functional, OR
system is operating in a
redundant state but with an
impending failure warning
Non-critical - system is
operating in a degraded
state with an impending
failure warning, although
still functioning
Critical, non-recoverable -
system is halted
www.insightdlp.com
Page 12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dlp director 2000

Table of Contents