Advertisement

Quick Links

INSIGHT DLP DIRECTOR 2200 Appliance
Hardware Installation Guide

Advertisement

Table of Contents
loading

Summary of Contents for INSIGHT DLP DIRECTOR 2200

  • Page 1 INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide...
  • Page 2: Table Of Contents

    Bezel Installation on the Appliance ..........INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com...
  • Page 3: Safety Notice And Warnings

    Ratings AC input voltage: 100 - 240V (auto-range) Input frequency range: 50-60 Hz Rated input current: 100 - 127V ~/7.0A Max 200 - 240V ~/3.5A Max INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 3...
  • Page 4: Electrical And General Safety Guidelines

    Be sure to recycle the old battery packs properly. Comply with all applicable battery disposal and hazardous material handling laws and regulations in the country or other jurisdiction where you are using the BBU. INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 4...
  • Page 5 Put the motherboard and peripherals back into their antistatic bags when not in use. For grounding purposes, make sure your computer chassis provides excellent conductivity between the power supply, the case, the mounting fasteners and the motherboard. INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 5...
  • Page 6: Site Preparation

    Install near appropriate AC outlets, and Ethernet hubs or individual jacks. Be sure to install an AC Power Disconnect for the entire rack assembly. The Power Disconnect must be clearly marked. Ground the rack assembly properly to avoid electrical shock. INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 6...
  • Page 7: Unpacking The Appliance

    Complete chassis and adjustable rack rail assembly (outside view) Inner fixed chassis rail Chassis rail locking pin Chassis rail release button Adjustable rack rail, front bracket Adjustable rack rail, center sliding rail Adjustable rack rail, rear bracket INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 7...
  • Page 8: Prepare And Assemble The Rack Rails

    INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 8...
  • Page 9: Installing The Rails On The Appliance

    Carefully slide it out supporting the unit on both sides at all times. INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 9...
  • Page 10: Rear Panel Connections

    Full Height PCIe Expansion Slot VGA Port Three USB Ports Serial Port eth4 Port Not Used (Optional IPMI Port) eth7 Port MGMT Port eth6 Port SPAN Port eth5 Port DLP Port eth3 Port INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 10...
  • Page 11 In normal operation the Power Good LED on Power Supply Module 1 will be SOLID GREEN and the LED on Power Supply Module 2 will BLINK GREEN (redundant standby), if the system is powered down both LEDs will BLINK GREEN. INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 11...
  • Page 12: Front Panel Operation

    Hard Drive Activity LED failure warning, although still functioning Power Button with Integrated LED Critical, non-recoverable - AMBER Solid - On DLP Activity LED system is halted INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 12...
  • Page 13: Bezel Installation On The Appliance

    Right Fixed ht F ixed Left Flexible Left F lexib Bezel Tab Bezel T Bezel Tab Bezel T INSIGHT DLP DIRECTOR 2200 Appliance Hardware Installation Guide www.insightdlp.com Page 13...
  • Page 14 2900 South Quincy Street Suite 330 Arlington, VA 22206 877-610-5625 877-605-8482 (F) www.insightdlp.com Copyright ©2016 INSIGHT DLP. All rights reserved.

Table of Contents