6
Installing Input and Output Cables / 安装输入输出线缆
NOTE / 说明
1.
Cables can be routed in and out from the top. The ground terminal is identified by a
进出线方式:上进上出。接地端子通常以
标志标识。
2.
The colors of the power cables for your reference. The local cable color standards prevail.
线缆颜色仅供参考,请以当地电源线缆标准为准。
3.
Grey shaded area for wiring area.
灰色阴影区域为接线区域。
4.
PE copper bar is installed at bottom side of the precision PDF. The specific positions prevail.
PE排在配电柜底部,具体位置请以实物为准。
Port Description / 接口说明
Cable diameter / 线径
Bolts / 螺栓
2
UPS (+ N -)
3 * (3 * 240)mm
M16
PE / 地线
240mm
2
M16
2
BAT (+ N -)
3 * (2 * 185)mm
M16
1.
Install the UPS cables. 安装UPS线缆。
2.
Front view of the cabinet / 机柜前视图
Front view of the cabinet / 机柜前视图
4
3.
Install the signal cables. 安装信号线缆。
To UPS BCB signal port
sign.
接往UPS BCB干接点接口
Recommended Torque / 推荐扭矩
(N· m)
120
120
120
Install the battery cables. 安装电池线缆。
Front view of the cabinet / 机柜前视图
6.1
Cascading of BIB / BIB板级联
NOTE / 说明
A maximum of four BIBs can be cascaded.
最多支持4个BIB级联。
DIP switch settings of BIB / BIB板拨码开关状态设置
6.2
Number of BIB
Boards / BIB板个数
1
2
3
4
BIB板 J1接口
UPS BCB干接点接口
J1 Signal Port on
UPS BCB Signal Port
the BIB board
5 OL
OL
6 STA
STA
7 DRV
DRV
8 GND
0V
NOTE / 说明
BIB board description /
BIB板描述
Control signal port J1 /
J1
控制信号接口J1
DIP switch S1 /
S1
拨码开关S1
To UPS BCB signal port
接往UPS BCB 干接点接口
BIB1
BIB2
BIB3
BIB4
DIP switch settings for different numbers of BIB boards / 不同BIB板个数拨码开关设置状态
BIB 1
BIB 2
BIB 3
Toggle switch 1 ON
_
_
1脚ON
Toggle switch 2 OFF
_
_
2脚OFF
Toggle switch 1 OFF
Toggle switch 1 OFF
_
1脚OFF
1脚OFF
Toggle switch 2 OFF
Toggle switch 2 ON
_
2脚OFF
2脚ON
Toggle switch 1 OFF
Toggle switch 1 OFF
Toggle switch 1 ON
1脚OFF
1脚OFF
1脚ON
Toggle switch 2 OFF
Toggle switch 2 OFF
Toggle switch 2 OFF
2脚OFF
2脚OFF
2脚OFF
Toggle switch 1 OFF
Toggle switch 1 OFF
Toggle switch 1 OFF
1脚OFF
1脚OFF
1脚OFF
Toggle switch 2 OFF
Toggle switch 2 OFF
Toggle switch 2 OFF
2脚OFF
2脚OFF
2脚OFF
5
7
Checking After Installation / 安装后检查
After the installation is completed, verify the items in the following tables before power-on.
安装完成后,在上电前,请根据下表内容进行检查。检查合格后方可进行上电操作。
Electrical connection checklist / 电气连接检查
7.1
No. /
编号
All cables are correctly connected based on the Schematic Diagram.
1
参考原理图,检查所有接线是否正确。
Ground cables are securely connected.
2
检查地线是否已连接牢靠。
Redundant parts of the ground cables and power cables are cut off instead of coiled.
3
电源线、地线的余长应被剪除,不能盘绕。
Phase cables are connected properly.
4
各相位连线正确。
Power cables and ground cables are routed and bundled separately from other types of cables.
5
电源线、地线在布放时应与其他电缆分开绑扎。
All circuit breakers are OFF.
6
所有空开处于"OFF"状态。
Hardware installation checklist / 硬件安装检查
7.2
No. /
编号
The cabinet is clean, without dust or sundries.
1
机柜清洁干净,无灰尘、污物,柜内无杂物。
The paint on the cabinet exterior is intact. If paint flakes off, repaint that area immediately to avoid corrosion.
2
外部漆饰应完好,如有掉漆,立即补漆,以防止腐蚀。
The cabinet door and lock work properly.
3
柜门开闭灵活,门锁正常。
All labels are correct, clear, and complete.
4
各种安全警告标识正确、清晰、齐全。
The surrounding area of the cabinet contains no waste tape, cable ties, paper, or packing materials.
5
机柜周围不得有胶带、扎带线头、纸屑和包装袋等施工遗留物。
Cable installation checklist / 线缆安装检查
7.3
No. /
编号
All bolts are tightened, especially the bolts used for electrical connection. Flat washers and spring washers are
1
installed properly in the correct sequence.
所有螺栓都要拧紧(尤其要注意电气连接部分),平垫、弹垫要齐全,且不能装反。
Cables are bundled neatly, and cable ties are secured evenly and properly in the same direction.
2
电缆绑扎应整齐美观,线扣间距均匀,松紧适度,朝向一致。
Cables are routed for ease of future maintenance and expansion.
3
电缆布放应便于维护和将来扩容。
There is no unnecessary adhesive tape or cable tie on the cables.
4
线缆上无多余胶带、扎带等遗留。
Exposed parts near the wiring terminals and lugs are wrapped in PVC insulation tape or heat shrinking tubing.
5
接线端子处的裸线及线鼻柄应用绝缘胶带缠紧,或套热缩套管,不得外露。
The power and signal cables are routed in accordance with the weak- and strong-current cable routing
6
specifications and the cable routing plan.
电源线走线和监控线走线满足强弱电走线要求,符合系统走线规划。
8
Powering On and Commissioning / 上电调测
1.
Switch on the disconnector and molded case circuit breaker.
闭合机柜内的隔离开关和塑壳断路器。
2.
Check that the voltage of each branch is normal by using a multimeter.
用万用表检查支路电压是否正常。
BIB 4
3.
After the check, switch off all circuit breakers in sequence.
检查所有电压正常后,依次断开所有空开。
_
_
This guide is for reference only, if any change, the actual product prevails.
本指南仅供参考,内容如有改动,请以实物为准。
_
_
_
_
Toggle switch 1 OFF
1脚OFF
Toggle switch 2 ON
2脚ON
Check That / 检查项
Check That / 检查项
Check That / 检查项
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People's Republic of China
www.huawei.com
华为技术有限公司
深圳市龙岗区坂田华为总部办公楼
邮编:518129
www.huawei.com
4008302118
6

Advertisement

loading