IBM Accesser F5100 Appliance Manual page 22

Table of Contents

Advertisement

2. Slide the chassis rails into the rack rails, keeping the pressure even on both sides, as shown in the
following figure. You might have to depress the locking tabs when inserting. When the appliance is
pushed completely into the rack, you can hear the locking tabs click into the locked position.
Figure 10. Push chassis into rack
3. Secure the chassis to the rails with the captive M6 thumbscrews on the server.
Cable the appliance
1. On the rear panel, connect the C13 end of the power cables to the C14 inlets in the PSU, as shown in
the following figure.
Figure 11. Rear of appliance
2. The Ethernet connections are located just to the left of the center of the appliance and are next to
each other. Connect a standard Ethernet cable from the left Ethernet port.
3. Press the power button that is on the top far right corner of the appliance front panel when the bezel is
unscrewed and flipped down.
4. To ensure that the power is on, verify that the power and network link lights are lit and listen for
running fans, as shown in the following figure.
Figure 12. Front of appliance
10 IBM Cloud Object Storage System: Accesser F5100 Appliance Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

3401-a023403-a02

Table of Contents