GBA C 2100 3 E
4
I
NSTALLATION AND ELECTRICAL INSTALLATION
4.1
I
NSTALLATION
Before the installation of the appliance, observe the following:
Inspect the unit for any defect or damage sustained in transit.
Check all screw connections for tightness.
Familiarize yourself with the Instructions for Use and with the conditions for the safe operation of this
appliance.
Practice:
Place the hot plate at a suitable location.
Prepare cut-out for hot plate in on site worktop.
Prepare cut-out for thermostat built-in casing in on site counter top.
Remove the toggle from the thermostat built-in casing and screw off the front cover.
Guide the thermostat built-in casing through the cut-out opening from behind.
Screw the front cover to the thermostat built-in casing again and push on the toggle.
Attach the front cover to the on site counter cover.
Attach the hot plate from above in the workplace section.
Seal the hot plate edge.
Clean the hot plate before the first use according to chapter "Cleaning and care".
BA
Last revised 05-2020
Page 12 of 25
Mai 20, 2020
Rev. 3