GBA C 5110 2 E
4
I
NSTALLATION AND ELECTRICAL INSTALLATION
4.1
I
NSTALLATION
Before the installation of the appliance, observe the following:
Inspect the unit for any defect or damage sustained in transit.
Check all screw connections for tightness.
Familiarize yourself with the Instructions for Use and with the conditions for the safe operation of this
appliance.
Practice:
Place the hot plate at a suitable location.
Prepare cut-out for hot plate in on site worktop.
Prepare cut-out for temperature controller built-in casing in on site counter top.
Screw off the front cover from the temperature controller built-in casing.
Guide the temperature controller built-in casing through the cut-out opening from behind.
Screw the front cover to the temperature controller built-in casing again.
Attach the front cover to the on site counter cover.
Attach the hot plate from above in the workplace section.
Seal the hot plate edge.
Clean the unit before the first use according to chapter "Cleaning and care".
BA
Last revised 03-2021
Page 11 of 24
März 17, 2021
Rev. 2