Electrical Wiring; Control Box - Riello RDB Installation, Use And Maintenance Instructions

Kerosene burners, one stage operation
Table of Contents

Advertisement

7.2

Electrical wiring

~
50Hz - 230V
PE
L
N
Main switch
T6 A
Safety
thermostat
Limit
thermostat
4 pin plug
4 pole socket
Burner-earth
Motor
Black
White
Capacitor
 Do not swap neutral and phase over, follow
the diagram shown carefully and carry out a
good earth connection.
 The electrical wiring carried out by the
WARNING
installer must be in compliance with the rules
in force in the country.
 The section of the conductors must be at
least 1mm
local standards and legislation).
TESTING:
Check the shut-down of the burner by opening the thermostats
and the lock-out by darkening the photoresistance.
3055
Electrical system
Remote lock-out signal
(230V - 0.5A max.)
TO BE COMPLETED
BY THE INSTALLER
Ignition
CARRIED-OUT
electrodes
IN THE FACTORY

CONTROL BOX

535SE/LD
Photoresistance
Blue
D4218
2
. (Unless requested otherwise by
7.2.1
Control box
DANGER
To remove the control box (Fig. 18) from the burner follow of the
istruction:
 Loosen the screw 1), open the protection 2) and remove all
components.
 Remove the coil 3).
 Loosen the two screws 4).
 Move a little the control box and remove the high voltage
leads.
4
3
4
Oil valve
Fig. 17
18
GB
This operation must be performed with the burner
turned off and mains power disconnected.
2
E9151
1
Fig. 18

Advertisement

Table of Contents
loading

Table of Contents