Operation and Installation Manual PBTC-200-E
NOTICE
Insulation resistance measurement is recommended at certain stages:
 Preliminary test (on the reel, before installation of the trace heater on the construction site)
 Acceptance test (after installation of the heating circuit and before installation of the thermal insulation)
 Final inspection (immediately after completion of work on the thermal insulation)
 Upon commissioning
 Before switching on the installation
 Observe the
Maximum withstand temperature / max. service temperature end seal and the
Max. continuous operating temperature, energized and
Max. continuous exposure temperature, de-energized of the heating cable
 Recommendation for use of heating cable PSB and MSB:
Installation of heating cable and end seal directly on the workpiece
 Recommendation for use of heating cable HSB+ and HTSB:
install the end seal for protection of excessive heat above the insulation but below the outer cladding

Applying the Pipe Insulation

 Apply the pipe insulation according to the manufacturer's installation instructions.
 Apply an electrical warning label every 3 m on a clearly visible place.
21-54C3-7D0001/A
Notice: Technical data subject to change without notice.
05/2023-EHT-441168
No claims for damage arising from alternations, errors or misprints shall be allowed.
38
39
Page 31 / 40

Advertisement

Table of Contents
loading

This manual is also suitable for:

27-54c2-4412/e210

Table of Contents