Download Print this page

Daintree GE Tetra Atom Installation Manual page 3

Led lighting system

Advertisement

Tetra
Atom
®
Layout Modules
Before you begin, clean
1
surfaces and remove all
debris from the inside of
the channel letter.Clean the
surfaces with a 50:50 mixture
of isopropyl alcohol (IPA) and
water and let dry.
4
Use the double stick tape or
electrical grade RTV silicone
to fix LED module within the
channel letter.
Measure and cut Tetra LED
2
strip to the appropriate
length for each letter. Cuts
can be made between any of
the modules.
Drill a 1/4-inch (6.4 mm)
5
hole near the LED strip and
grommet the hole for supply
wire access.
NOTE: For halo-lit applications LED modules should be mounted on
UL recognized clear acrylic or polycarbonate. The light output from
the LED system should be directed back into the sign enclosure. This
will allow for uniform backlighting of the sign and will provide simple
mounting.
3
Installation Guide
Do not
press lens
Remove tape backing and stick
3
LED modules into place. When
using tape apply approximately
15 psi pressure on the module
(avoid the lens dome surface) for
5 seconds, full bonding strength
after 24 hours. Continue until you
have reached the end of the strip.
Remove all the debris from the
6
inside of the channel letter and
replace the sign face.

Advertisement

loading

This manual is also suitable for:

Ge tetra sign268Ge tetra geam2471-w1Ge tetra geam2465-w1Ge tetra geam2457-w1Ge tetra geam2450-w1Ge tetra geam2441-w1 ... Show all