Page 1
120D Enclosed Work Bench Assembly Instructions Tools Needed: www.pollardbros.com Includes: wrench at head screwdriver (2) Side Plates (Left & Right) (1) Back Plate (2) Rear Uprights(Left & Right) (2) Front Uprights (1) Top Front Cross Angle (2) Top Support Angles (2) Cabinet Doors (1) Steel Top (1) Ball Bearing Drawer 5/16”...
Page 2
Steps: Determine which are the Front and which are the Front Upright Rear Uprights. The Front Uprights have four extra holes for the hinges. Both Front and Rear Uprights are made as left and rights. Rear Upright Lay rear uprights on oor about 55” apart. Insert (5) 1/4”...
Page 3
Attach front Uprights using (16) 1/4” x 5/8” Round Head Machine Screws, 1/4“ Lock Wash- ers, and 1/4” Hex Nuts. HAND TIGHTEN ONLY. Bolt the top front cross angle inside of the front uprights at the top with angle ange facing in. Use (4) –...
Page 4
Note: To detach the drawer depress black lever up on right and down on left slides simultaneously as you pull the drawer out. Pollard Brothers Manufacturing 5504 N. Northwest Highway Chicago IL 60630 (773)763-6868 (773)763-4466 (800) 551-5566 phone...
Need help?
Do you have a question about the 120D and is the answer not in the manual?
Questions and answers