Performance Verification; Test Equipment Required To Complete Performance Verification - Agilent Technologies N2775A User Manual

Table of Contents

Advertisement

Performance Verification

This procedure verifies the electrical characteristics of the N2775A Power
Supply. The recommended calibration performance calibration interval for the
N2775A is one year.
Perform the complete performance verification procedure as the first step of
annual certification. The performance verification is to be done without removing
the supply covers.

Test equipment required to complete performance verification

Description
Digital AC/DC
voltmeter
Load resistors
BNC Female to Double
Stacking Banana Plug
BNC Male to Stackable
Binding Post
BNC T
Shielded test lead Kit
Power output
connector
Minimum Requirements
Voltmeter accuracy \ 0.1% Agilent 34401A
Two 15 Ω, 2.4 W
Attach three different color 26
AWG (5 cm) wires to 12 V
and GND of the Plug
N2775A Power Supply
Performance Verification
Recommended test
equipment
Agilent 0698-3605
Agilent E9637A
Pomona 1296
Agilent E9625A
Pomona 5292-48
LEMO Plug:
±
FFA. OS. 304. CNAC42Z
13

Advertisement

Table of Contents
loading

Table of Contents