Turn On The Power - GeoVision GV-Storage System V2 Quick Start Manual

Table of Contents

Advertisement

GV-Expansion System
Connect the SAS Port (In) of GV-Expansion System to the SAS Port (Out) of GV-Storage
System V2. There are two methods to examine the connection between the storage system
and expansion system.
1. If the connection is successful, the LED of SAS port flashes in blue.
2. If the connection is successful, you can see the JBOD information from System
Maintenance, System Information tab on the Web UI.

2.2 Turn on the Power

1. Press the power button on the front panel.
2. Check status of powering on to ensure that everything is running smoothly.
Power LED: The LED on the front panel should turn blue.
Drive Tray LED: Power LEDs for all drive bays containing hard drives should light up.
SAS LED: If GV-Storage System V2 is connected with GV-Expansion System, the
SAS LED turns blue.
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GV-Storage System V2 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

85-storage-0001

Table of Contents